Laserfiche WebLink
Chevron Monitoring Certification Checklist <br /> Store Number : 209167 Address : 1234 E. YOSEMITE AVE @ SPRECKLES MANTECA, CA 95336 <br /> Date : 2/7/ 2020 Technician : Jesus Saldivar Company: TANKNOLOGY INC. <br /> Step Instruction T:2 T: 1 <br /> Product REGULAR SUPREME <br /> Tank Type Fiberglass Fiberglass <br /> (DW FRP, DW Steel, SW FRP) <br /> 1 Annular Riser Height ( measured ) 73 .50 in. 73 .00 in. <br /> 2 Tank Diameter: (from tank chart, 120 . 00 in. 120 . 00 in. <br /> forexample : 118. 375 ; 117. 75 ", 111 ", 92 ", etc. ) <br /> 3 For FRP tanks, 1/2 circumference of the tank 188 .40 in. 188 .40 in. <br /> (0.5 X 3. 14X tank diam.) OR (q.57 x step 2) <br /> Required annular sensor length : <br /> 261 . 90 in. 261 .40 in. <br /> 4 FRP = Riser + 1/2 Circumference = step 1 + step 3 <br /> Steel = Riser + diameter = step 1 + step 2 <br /> Mark & label the required sensor length on <br /> 5 sensor cord . Label should be under the cap & Yes Yes <br /> serve to prevent the cord being pulled too short. <br /> Is tank annular sensor in the correct position ? <br /> Yes Yes <br /> 6 FRPTanks: with the marked required length <br /> lining up with the top of the annular riser? Yes Yes <br /> Steel Tanks : sensor touching bottom with slack <br /> above the marked required sensor length ? <br /> Are the DW pipe boots pulled back in tank sumps ? <br /> 8 (YIN or N/A, note if can 't be verified because Yes Yes <br /> clamshell pointing down) <br /> Are tank sump sensors back in their holders and <br /> 9 in the correct position ? Yes Yes <br /> (YIN or N/A document with photo) <br /> 7 Approximate gallons of product dispensed for <br /> purging, etc . and returned to tank <br /> Has the Veeder Root Battery been replaced & dated prior to failsafe ? Replaced in Last 30 Days <br /> (If battery backup failed, label and leave failed battery on top of console, note in comments and advise your OM) <br /> Has Veeder Root Programming before & after testing been printed & verified ? Yes <br /> (especially tank manifolding setup - see Note 2) <br /> Has Veeder Root Programming before & after been attached to the Work Order? Yes <br /> Have all sensor model numbers been verified against the Veeder Root cord label ? Yes <br /> Make a note if sensor label missing or illegible, & approx. cord length for -208/-209 with missing labels <br /> V 77 r. <br /> Additional Comments : <br /> k <br /> EXTERNAL ALARM WAS NOT WOKING RITE, WHEN TESTING PROBES. # 3 <br /> BUT WAS WORKING ON VEEDER ROOT. � <br /> Note 1: Certain Veeder Root Software versions will automatically revert to the default tank manifold settings anytime the programming Is icilangedis}ldh eh segs�j�sa��� � <br /> temporarily X'ed out, etc. ,` 6 <br />