Laserfiche WebLink
Page 2 of 2 <br /> 2 . SECONDARY PIPE TESTING <br /> Test Method Developed By : ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used : ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used : See attached testing procedures Equipment Resolution : <br /> Piping Run # 87 Piping Run # 91 Piping Run # Piping Run # <br /> Piping Material : Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter : 3 " 3 " <br /> Length of Piping Run : Approx 200 ' Approx 200 ' <br /> Product Stored : Regular Premium <br /> Method and location of Test boot in Sump Test boot in Sump <br /> piping-run isolation : <br /> Wait time between applying 30 minutes 30 minutes <br /> pressure/vacuum/water and <br /> startin test: <br /> Test Start Time : Visual Failure 9 : 05am <br /> Initial Reading (Ri) : 5 PSI 5 PSI <br /> Test End Time : 10 : 05am <br /> Final Reading (RF) : 5 PSI 5 PSI <br /> Test Duration : 1 hour 1 hour <br /> Change in Reading (RF-RI) : 0 0 <br /> Pass/Fail Threshold or 0 . 00 0 . 00 <br /> Criteria: <br /> Test Result: ❑ Pass ® Fail ® Pass ❑ Fail `+ ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments — (inchide information on repairs made prior to testing, and recommended follow-zrp for•failed tests) <br /> 87 Prod Sec Line - Visual Failure <br /> i <br /> i <br />