My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 3:26:56 PM
Creation date
7/16/2020 3:06:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95242
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />6, TANK SECONDARY CONTAINMENT TEST -- - _ _.� ------ - <br />Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br />Test Type ❑ Pressure ® Vacuum ❑ Hydrostatic <br />Test Equipment Used, Vacuum Pump/Vacuum Gauges in Hg. <br />Tank ID <br />1 -87 -Main <br />2 -87 -Siphon <br />3 -Diesel <br />- <br />Tank Manufacturer <br />Perkins <br />Perkins <br />Perkins <br />Tank Capacity <br />10K <br />2K <br />5K <br />Test Start Time <br />1:40 <br />1:50 <br />2.00 <br />Initial Reading <br />-6" Hg. <br />-6" Hg. <br />-6" Hg. <br />Test End Time <br />2:40 <br />2:50 <br />3:00 <br />Final Reading <br />-6" Hg. <br />-6" Hg. <br />-6" Hg. <br />Change in Reading <br />0" Hg. <br />0" Hg. <br />0" Hg- <br />Pass/Fail Criteria <br />No Loss <br />No Loss <br />No Loss <br />Tightness Test Results <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />7. PIPE SECONDARY CONTAINMENT TEST <br />Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br />Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br />Test Equipment Used: Pressure Gauges in <br />Psi/Nitrogen <br />Pipe Run ID <br />1 -87 -Main <br />2 -87 -Siphon <br />3 -Diesel <br />Pipe Manufacturer <br />Smith <br />Smith <br />Smith <br />Test Start Time <br />2:15 <br />1:20 <br />1:35 <br />Initial Reading <br />5 Psi <br />5 Psi <br />5 Psi <br />Test End Time <br />3:15 <br />2:20 <br />2:35 <br />f=inal Reading <br />5 Psi <br />5 Psi <br />5 Psi <br />Change in Reading <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Criteria <br />No Loss <br />No Loss <br />No Loss <br />Tightness Test Results <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Pipe tun ID <br />Pipe Manufacturer <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results <br />W� <br />ass ❑ Fail <br />❑ Pass-l---]Fail— <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Additional copies of this page may be attached. <br />All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.