My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
2300 - Underground Storage Tank Program
>
PR0543446
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2022 11:43:57 AM
Creation date
7/20/2020 9:29:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0543446
PE
2351
FACILITY_ID
FA0024656
FACILITY_NAME
7-ELEVEN #38153
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
121 S CENTER ST
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71SO-TOOL PROCEDURE BELOW, Caution: If the drill stop is not in the proper <br /> FOR 71SO-TOOLC, SEE PAGE 9 location failure of a pressure decay leak test may <br /> result. <br /> STEP 9A: INSERT 71SO-TOOL OVER INLET <br /> TUBE 71 SO-TOOL <br /> To install the 71 SO-TOOL (sold separately)over the <br /> inlet tube, first loosen all three knobs, so the tool can o <br /> pass freely over the inlet tube flange. Align the slot <br /> on the tool with the key on the inlet tube and insert <br /> the tool down. See Figure 9A. <br /> Tool slot Loosen all Hand Tip to stop dimension <br /> knobs View holes tighten must be 2 to 2-1/16 inch <br /> knobs Figure 11A <br /> evenly <br /> STEP 12A: DRILL HOLES <br /> With the inlet tube and 71 SO-TOOL in place, <br /> carefully drill a 3/16" diameter hole in the upper tube <br /> o using the drill bushing in the knob as a guide. The <br /> drill stop is positioned so it will bottom out against <br /> Q the knob after the bit has drilled through the upper <br /> drop tube. If the stop is positioned wrong either no <br /> Inlet hole will be drilled, or a through hole could <br /> Tube potentially be drilled through the inlet tube. If no <br /> key hole is drilled return to step 11 and check the stop <br /> dimension. If a hole is drilled through the inlet tube <br /> or into the screw hole the assembly is not <br /> salvageable. Drill (2) more holes in the two <br /> remaining knobs. <br /> Figure 9A Figure 10A <br /> STEP 10A: TIGHTEN THE 71SO-TOOL <br /> Use the three view holes to ensure that the tool <br /> seats out flat against the top of the inlet tube. To <br /> prevent vertical movement of the tool during drilling <br /> hand tighten all three knobs evenly the upper drop <br /> tube. See Figure 10A. <br /> ® Drill thru upper <br /> STEP 11A: PREPARE DRILL AND BIT tube only <br /> Confirm that the stop on the 3/16" drill bit supplied <br /> with the 71SO-TOOL is in the correct position before Figure 12A <br /> drilling. The stop is factory installed at a distance <br /> between 2"to 2-1/16"from the tip with the 71 SO- <br /> TOOL. If the stop is not at the correct position it <br /> must be fixed before drilling. <br /> 68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.