Laserfiche WebLink
A.fforda-Telpt 416 2" Street <br /> Galt, CA 95632 <br /> (209) 744-0113 Fax (209) 744-0116 <br /> E.O.VR-203/204 <br /> Veeder-Root Vapor Polisher Operability Test Form <br /> Permit Number: N9259-1-0 Date of Test: 11/12/2019 Time: 1040 <br /> Site Name: ARCO STOCKTON <br /> Site Address: 6009 N EL DORADO ST <br /> City: STOCKTON, CA Zip: 95207 Technician: FELIX RAMIREZ <br /> VST: 3001003870 <br /> District: SJVAP NORTH Veeder-Root: B34976 <br /> TEST INFORMATION <br /> Calibration date for digital manometer(must be within 6 months of the test) 09-01-19 <br /> Ending value for digital manometer drift test(must be 0.01 in.w.c. or less) 0 <br /> Calibration date for thermometer(must be with 6 months of the test) NA <br /> Vapor polisher valve close date and time(must have been closed for at least 2 hours) 11-12-19 1 830 <br /> Atmospheric pressure sensor serial number 8280 <br /> PRESSURE INTEGRITY TEST <br /> Nitrogen gas flow rate(scfh) 18 SCFH <br /> Starting pressure(in.w.c.) 8.00 <br /> Final pressure at 1 minute(in.w.c.) 8.03 <br /> Is the final pressure>7.0 in.w.c.? Yes <br /> Is the difference between the starting and final pressure<0.5 in.w.c.? Yes <br /> NOTES: 'If the final pressure is not > 7.0 in. w.c. and the difference is not < 0.5 in. w.c., then the vapor polisher is not in <br /> compliance. <br /> FLOW TEST <br /> Nitrogen gas flow rate(scfh) 18 SCFH <br /> Pressure(in.w.c.) 2.03 <br /> Is the pressure between 1.69 and 2.25 in.w.c.? Yes <br /> NOTES: 'The flow rate must be 18.0:L 0.2 scfh. <br /> 2The pressure must be between 1.69 and 2.25 in.w.c.or the vapor polisher is not in compliance. <br /> 'Three-way valve must be returned to normal(open)operating position after testing is completed. <br /> VMC valve mode must be re-set to automatic after testing is completed. <br /> I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed <br /> after reasonable inquiry, the statements and information provided in this document are true, accurate, and complete. <br /> Signature of Technician: Date: 11-12-19 <br /> Ver. 1.1—01.20.09 <br />