Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault;4)devices monitoring product piping;5)devices monitoring fill piping;6)devices monitoring vent piping;7)devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors;and 11) devices monitoring any other secondary containment areas. <br /> Monifaring Systn Cer9i cation <br /> UST Monitonng Site Plan <br /> Site Address: ARCO ETOCKTON-OXG N EL DORADO ST S'OCXTON.CA <br /> FIFL�G _ _ Imy <br /> (A.RROR S) A=_jL't;NLM&K SunDr <br /> DMIving of piping - F=FILLS <br /> ej-t of sump and - V_VAPOR <br /> LDC'=__No - - F=FROEE <br /> " `p°"na - STARE TLS-354 L Turbine±Lml Detector <br /> drawing is _ _ X=EUMP SENSOR <br /> accurate,Ite B=93eiae Seotar <br /> cannot speculate - _ S=Smart Sensor <br /> blue printer _ _ C=Moats&.Chains <br /> . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . .g. . .—. -_ . . . . . . . . . . <br /> . . . . _ _ . . . . . . . . <br /> 91 D <br /> T T <br /> LD <br /> _ 3C <br /> t. F <br /> 87 <br /> J' <br /> _4rlriaene ern�rgrxxardliyeraeener�re>:b1r rp fJxes�(rd>g f�i}arfeden as a <br /> �4fiastr+m+l opsxa.r��.areirtr sc�JFx+yfis.Tra<rnc.rdper�Fxu+r L4atciflE <br /> rroY fv:cds <br /> ❑aie map was dranrr 11117199 <br /> I nsfructions <br /> If you&wady have a diagram that shows all—4,jired itdarmatkm,you may invade it,rather than€Ks page,wah yvLc Monitoring Syslem Cerfiricatbm On your site plan, <br /> shrrn the general."t c f&aAs and piping. Clearly identify kwatians Dfthe following equipn e (ifirratalled:rn itorsrtg system ooeo-srol panels:seg M monita ing lank <br /> annularspaces.sumps,dnspeaser pans.spill containers,m ottwseaondary containmerrtarr=as:mechariral or electronic Tine leakaecL�_ars:ar•:in-tank liquid level <br /> j-rahes r'd used for leak detection). In the space provided,note the date this Site Play,was prepared. <br /> LEGEND <br />