My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/24/2020 2:31:24 PM
Creation date
7/20/2020 9:31:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0542116
PE
2351
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
01
SITE_LOCATION
6009 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fforda-Te$t 416 2nd Street <br /> Galt, CA 95632 <br /> (209) 744-0113 Fax (209) 744-0116 <br /> E.O.VR-203/204 <br /> Veeder-Root Vapor Polisher Operability Test Form <br /> Permit Number: N-9259 Date of Test: 12/6/2018 Time: <br /> Site Name: GRIN INVESTMENT ARCO AMPM <br /> Site Address: 6009 N. EL DORADO STREET <br /> City: STOCKTON, CA Zip: 95207 Technician: ZANE NIMMO <br /> VST: 3000839502 <br /> District: SJVAPCD Veeder-Root: A28446 <br /> Calibration Date: DAILY <br /> TEST INFORMATION <br /> Calibration date for digital manometer(must be within 6 months of the test) 10/13/2018 <br /> Ending value for digital manometer drift test(must be 0.01 in.w.c. or less) .00 <br /> Calibration date for thermometer(must be with 6 months of the test) NCO A <br /> Vapor polisher valve close date and time(must have been closed for at least 2 hours) 10/13/2018 1 1210 <br /> Atmospheric pressure sensor serial number 8 2 8 0 <br /> MM PRESSURE INTEGRITY TEST <br /> Nitrogen gas flow rate(scfh) 15 SCF H <br /> Starting pressure(in.w.c.) 8.03 <br /> Final pressure at 1 minute(in.w.c.) 8.01 <br /> Is the final pressure>7.0 in.w.c.? Yes <br /> Is the difference between the starting and final pressure<0.5 in.w.c.? Yes <br /> NOTES: 'If the final pressure is not > 7.0 in. w.c. and the difference is not < 0.5 in. w.c., then the vapor polisher is not in <br /> compliance. <br /> FLOW TEST <br /> Nitrogen gas flow rate(scfh) 18 S C F H <br /> Pressure(in.w.c.) 1.86 <br /> Is the pressure between 1.69 and 2.25 in.w.c.? Yes <br /> NOTES: 'The flow rate must be 18.0 f 0.2 scfh. <br /> 2The pressure must be between 1.69 and 2.25 in.w.c.or the vapor polisher is not in compliance. <br /> 'Three-way valve must be returned to normal(open)operating position after testing is completed. <br /> VMC valve mode must be re-set to automatic after testing is completed. <br /> I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed <br /> after reasonable inquiry, the statements and information provided in this document are true, accurate, and complete. <br /> Signature of Technician: Date: 12/6/2018 <br /> Ver. 1.1—01.20.09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.