My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/24/2020 2:31:24 PM
Creation date
7/20/2020 9:31:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0542116
PE
2351
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
01
SITE_LOCATION
6009 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fforda-Te t 416 2"1 Street <br /> Galt, CA 95632 <br /> (209) 744-0113 Fax (209) 744-0116 <br /> E.O.VR-203/204 <br /> Veeder-Root Vapor Polisher Hydrocarbon Emissions Test Form <br /> Permit Number: N-9259 Date of Test: 12/6/2018 Time: <br /> Site Name: GRIN INVESTMENT ARCO AMPM <br /> Site Address: 6009 N. EL DORADO STREET <br /> City: STOCKTON, CA Zip: 95207 Technician: ZANE NIMMO <br /> VST: 3000839502 <br /> District: SJVAPCD Veeder-Root: A28446 <br /> Calibration Date: DAILY <br /> HYDROCARBON ANALYZER CALIBRATION CHECK <br /> Hydrocarbon analyzer zero check reading 0000 <br /> Hydrocarbon analyzer calibration check reading 9000 <br /> Is the zero check reading< 0.1%by volume? Yes <br /> Is the calibration check reading between 0.8% and 1.0%by volume? Yes <br /> HYDROCARBON EMISSIONS TEST <br /> Starting inlet test gas flow rate (scfh) 15 <br /> Ending inlet test gas flow rate (scfh) I 15 <br /> Hydrocarbon reading at 3 minutes (ppmv) 0 <br /> Hydrocarbon reading at 4 minutes (ppmv) 0 <br /> Hydrocarbon reading at 5 minutes (ppmv) 0 <br /> Hydrocarbon reading at 6 minutes (ppmv) 0 <br /> Is the hydrocarbon concentration<9000 ppmv for all readings? Yes <br /> NOTES: 'The hydrocarbon concentration must be less than 9000 ppmv for all readings otherwise the vapor polisher is not <br /> in compliance. <br /> 'Three-way valve must be returned to normal(open)operating position after testing is completed. <br /> 'The PMC vapor mode must be reset to automatic after testing is completed. <br /> I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed <br /> after reasonable inquiry, the statements and information provided in this document are true, accurate, and complete. <br /> Signature of Technician: Date: 12/6/2018 <br /> Ver. 1.1—01.20.09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.