My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/24/2020 2:31:24 PM
Creation date
7/20/2020 9:31:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0542116
PE
2351
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
01
SITE_LOCATION
6009 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared:11/18/2020 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Ste Address ARCO STOCKTON-8008 N EL DORADO ST STOCKTON,CA <br /> KEY <br /> A=?LNn r.ax Sensor <br /> F=FMLS <br /> *PIPL\G} V=VAPOR <br /> (.ERROR'S) � P=PROBE <br /> Drawing of <br /> piping etnt of STT TLS-350 L=Turbine'Leak Detector <br /> %=Sn P SENSOR <br /> sump and UDC's. <br /> No underground S=Brine Sensor <br /> S=Smart Sensor <br /> drawmg is C=Floats&Chain <br /> accurate,we <br /> E=E Stop <br /> cannot speculate <br /> blue prints. <br /> L _ 7. $ <br /> .3'= E]4, . . . . . . . . g. 10. . . . . . . . <br /> 5 8, <br /> .11 12._ <br /> 91 DIE <br /> v <br /> OX FO X in X v in <br /> X <br /> . . 87 <br /> t, <br /> O 1 <br /> T <br /> � X 1.n <br /> r <br /> 3rp•iierm and grated tha are nor risible to the cording twi rrician are a <br /> p�lessianl oFirrwr onjti and crs sdefi fcr irforrrntiaal purpcec Drmrirg <br /> not to scde <br /> Date map was drawn:11+18+20 <br /> Instructions <br /> If you already have a diagram that shows al required information.you may include 4.rather than this page•with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,6 installed:monitoring system control panels;sensors monitor ng tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas:mechanical or electronic line leak detectors:and in-tank liquid leve <br /> probes(if used for leak detection. In the spare provided,note the date this Site Ptan was prepared. <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.