My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2020 10:24:53 AM
Creation date
7/20/2020 9:34:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUNDSTORAGETANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6) <br /> XII. LINE LEAK DETECTOR TESTING <br /> ❑Check this box if line leak detectors(LLD)are NOT installed.(Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? ❑X ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified: ❑X 3 GPH ❑ 0.1 GPH ❑ 0.2 GPH <br /> Was the testing apparatus properly calibrated? ❑X ❑ ❑ <br /> For emergency generator tank systems,does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ X❑ <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak is detected? ❑ ❑ X❑ <br /> For electronic LLDs,does the turbine automatically shut off when a leak is detected? ❑X ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑X ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑X ❑ ❑ <br /> For electronic LLDs,have all accessible wiring connections been visually inspected for kinks and breaks? ❑X ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑X ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ❑X ❑ ❑ <br /> For any answer of"N"above, describe in Section Xlll how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM/PRESSURE/HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) ❑X Vacuum ❑Pressure ❑Hydrostatic <br /> Sensor ID Component(S)Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> S5 87 Product ❑X Pass ❑Fail ❑X Pass ❑Fail <br /> S6 Vapor Line ❑X Pass ❑FailX❑Pass ❑Fail <br /> S7 91 Product ❑X Pass ❑Fail ❑X Pass ❑Fail <br /> S9 Vent Lines ❑X Pass ❑Fail ❑X Pass ❑Fail <br /> s10 Diesel Product ❑X Pass ❑Fail ❑X Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail I ❑Pass ❑Fail <br /> How was interstitial communication verified? FX]Simulated Leak at Far Ends of the Interstitial Space ❑X Visual Inspection <br /> ❑X Other Describe the method in section XV below. ❑Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑X Yes ❑No(Describe the reason in section XV below.) <br /> For any answer of"Fail'above,describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> Leak was introduced at the test ports and at each product line inside the dispensers. <br /> GPH=Gallons Per Hour,Y=Yes,N=No,NA=Not Applicable,VPH=VacuumlPressurehiydrostatic,ID=Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.