Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (page s of s <br /> X11. LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors (LLD) are NOT Installed. (Do not complete this section) Y N NA <br /> This section must be completed if LLDs are Installed. <br /> Was a leak simulated to verify LLD performance? <br /> (Check all that apply.) Simulated leak rate verified: ❑X 3 GPH ❑ 0. 1 GPH ❑ 0.2 GPH ❑ ❑ <br /> Was the testing apparatus properly calibrated? ❑X ❑ ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? ❑ I ❑ N <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? ❑ I ❑ X❑ <br /> For electronic LLDs, does the turbine automatically shut off when a leak is detected? ❑X I ❑ I ❑ <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? Q ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or falls a test? X❑ ❑ ❑ <br /> For electronic LLDs, have all accessible wiring connections been visually Inspected for kinks and breaks? ❑X I El I ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? Q ❑ ❑ <br /> Were all LLDs confirmed operational withln regulatory requirements? ❑X I ❑ 1 ❑ <br /> For any answer of "N" above, describe In Section Xlll how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV, VACUUM I PRESSURE I HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH monitoring Is NOT used. (Do not complete this section) <br /> This section must be completed If VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply.) 0 Vacuum ❑ Pressure ❑ Hydrostatic <br /> r�1 Sensor ID Component(S) Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> S5 87 Product ❑X Pass ❑ Fall N Pass ❑ Fail <br /> so Vapor Una 0 Pass ❑ Fail ❑X Pass ❑ Fail <br /> S7 91 Product ❑X Pass ❑ Fail ❑X Pass ❑ Fail <br /> S9 Vent Lines ❑X Pass ❑ Fall ❑X Pass ❑ Fail <br /> 810 Diesel Product ❑X Pass ❑ Fail ❑X Pass ❑ Fall <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fall <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail I ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified? ❑X Simulated Leak at Far Ends of the interstitial Space 0 Visual Inspection <br /> X Other Describe the method In section XV below. Gauge <br /> Was the vacuum or pressure restored to operating levels in all Interstitial spaces? ❑X Yes ❑ No Describe the reason in section XV below.) <br /> For any answer of "Fall" above, describe in Section XV how and when these Issues were or will be corrected. <br /> XV. COMMENTS <br /> Leak was introduced at the test ports and at each product line inside the dispensers. <br /> GPH = Gallons Per Hots, Y = Yes, N = No, NA= NotApplicable, VPH = Vacwm1Pressure4VmsbliG ID = Identification <br />