Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM Page 6 of s <br /> XII . LINE LEAK DETECTOR TESTING <br /> FCheck x if line leak detectors (LLD) are NOT installed. (Do not complete this section.) Y N NA <br /> This section must be completed If LLDs are installed. <br /> Was a leak simulated to verify LLD performance? ❑ El(Check all that apply.) Simulated leak rate verified: ❑X 3 GPH ❑ 0.1 GPH ❑ 0.2 GPH <br /> Was the testing apparatus properly calibrated? ❑X El ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ X❑ <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? ❑ ❑ X❑ <br /> For electronic LLDs, does the turbine automatically shut off when a leak is detected? ❑X I ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? Q I ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑X 1 ❑ ❑ <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? Q I ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? []X I ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? X❑ I U [] <br /> For any answer of "N" above, describe in Section Xlll how and when these issues were or will be corrected. <br /> X111. COMMENTS <br /> XIV, VACUUM I PRESSURE / HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> Check this box If VPH monitoring is NOT used. (Do not complete this section) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply) ❑X Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor ID Component(S) Monitored By This Sensor Sensor Functionality+ Interstitial Communication <br /> Test Test <br /> S5 87 Product X❑ Pass ❑ Fail X❑ Pass ❑ Fail <br /> S6 Vapor Une 0 Pass ❑ Fail X❑ Pass ❑ Fall <br /> S7 81 Product ❑X Pass ❑ Fall ❑X Pass ❑ Fail <br /> S9 1 Vent Unes X❑ Pass ❑ Fall 1 Q Pass ❑ Fail <br /> S10 Diesel Product Q Pass ❑ Faii ❑X Pass ❑ Fall <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Faii ❑ Pass ❑ Fall <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fall <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fall <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Faii ❑ Pass ❑ Fail <br /> How was interstitial communication verified? ❑X Simulated Leak at Far Ends of the Interstitial Space X Visual Inspection <br /> X Other Describe the method in section XV below. Gauge <br /> Was the vacuum or pressure restored to operating levels In all interstitial spaces? ❑X Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "Fall"' above, describe in Section XV how and when these issues were or will be corrected <br /> XV. COMMENTS <br /> Leak was introduced at the test ports and at each product tine Inside the dispensers. <br /> GPH = Gallons PerHour, Y = Yes, N = No, NA = NotApplicable, VPH = VacxutVPressureHArostatic, ID = Identificatim <br /> t <br />