My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10715
>
2300 - Underground Storage Tank Program
>
PR0541281
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 1:55:06 PM
Creation date
7/20/2020 9:39:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0541281
PE
2361
FACILITY_ID
FA0023650
FACILITY_NAME
Trinity Parkway AMPM ARCO #83819
STREET_NUMBER
10715
STREET_NAME
TRINITY
STREET_TYPE
Pkwy
City
Stockton
Zip
95219
APN
6602002
CURRENT_STATUS
01
SITE_LOCATION
10715 Trinity Pkwy
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM <br /> XII , LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors ( LLD) are NOT installed . (Do not complete this section.) Y N N/A <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? ® ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified : ® 3 GPH ❑ 0. 1 GPH ❑ 0 . 2 GPH <br /> Was the test apparatus properly calibrated? ® ❑ ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected ? ❑ ❑ N <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected ? ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off when a leak is detected? N ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or N ❑ ❑ <br /> disconnected ? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a ® ❑ ❑ <br /> test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? ® ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed ? N ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? N ❑ ❑ <br /> For any answer of "N" above, describe in Section Xlll how and when these issues were or will be corrected. <br /> XIII . COMMENTS <br /> XIV. VACUUM/ PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH Monitoring is NOT used . (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type ( Mark all that apply. ) N vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor ID Component)s) Monitored By This Sensor Sensor Functionality Interstitial <br /> Test Communication Test <br /> S-1 87 product ® Pass ❑ Fail ® Pass ❑ Fail <br /> S=2 87 vent ® Pass ❑ Fail ® Pass ❑ Fail <br /> S-3 87 vapor ® Pass ❑ Fail N Pass ❑ Fail <br /> SA DSL product ® Pass ❑ Fail I ® Pass ❑ Fail <br /> S-S DSL vent ® Pass ❑ Fail I N Pass ❑ Fail <br /> S-6 91 product ® Pass ❑ Fail I ® Pass ❑ Fail <br /> S-7 91 vent ® Pass ❑ Fail ® Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified? ® Simulated Leak at Far Ends of the Interstitial Space ® Visual Inspection <br /> ❑ Other (Describe the method in Section XV below. ) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in interstitial spaces? ® Yes ❑ No ( Describe the reason in section XV below . ) <br /> For any answer of "Fail" above, describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> i <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.