Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: 824 E Yosemite Ave Manteca 95336 <br /> *PIPING <br /> . . . . . . . . . EMC .. . . . . . . . . . . . . . . . . . . . . (ARROWS) <br /> Drawing of piping <br /> . . . . . . . . . . . . . . . . . . . . exit of sump and <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . UDC's.No <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . underground <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . drawing is <br /> . . . accurate,we <br /> cannot speculate <br /> blue prints. <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . X . . . . X . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89 87 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . L L <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . P X P X . . . <br /> . . . . . . . . . . . . <br /> . . . . . . . . . . . . X X o <br /> . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . I . � . . . . . . . . 0 . . . <br /> KEY <br /> A=ANNULAR Sensor . . . . . . . . . . . . . . . . . . . . . . . . . 9 <br /> F=FILLS . . . . . . . . . . . . . . . . . . . . . . . . . 7 L <br /> V=VAPOR O . . . <br /> P=PROBE . . . . . . . . . . . . P X <br /> L=Turbine/Leak Detector . . . . . . . . . . . . . . . . . . . . . . . . O <br /> X=SUMP SENSOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> B=Brine Sensor V <br /> S=Smart Sensor O <br /> C=Floats&Chains F <br /> E=EStop <br /> . . . A <br /> Any items underground that are not visible to the certifying technician are a <br /> professional opinion only and are solely for informational purposes. Drawing not to <br /> scale. . . . . . . . . . . . . . . . . . . . . . . . . <br /> YOSEMITE AVE <br /> Date map was drawn 6/11/18 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 2/21/07 <br />