My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2020 1:53:30 PM
Creation date
7/20/2020 11:29:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
FACILITY_NAME
Colonial Energy CE 40134 (DBA Power Mart)
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br />71 SO Overfill Valve Upper Tube Calculation Worksheet <br />Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br />manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br />tion (AHJ) and review local, state, and national codes to determine the regulatory requirements governing <br />shut-off capacity in your region, as well as take into account other considerations such as extreme tank tilt. <br />Desired tank capacity for shut-off: <br />Dipstick Number on Tank Chart that corresponds to 100% volume (Y) _ <br />Dipstick Number on Tank Chart that corresponds to SO% (X) _ <br />Upper Tube Reference Number Z=Y-X <br />Upper Tube Depth Inside Tank C = Z-2" <br />Distance from top sealing surface for 71 SO Lip' to inside the <br />top of Storage Tank2 <br />SO%= <br />0 (Y) <br />0 (X) <br />0 (Z) <br />- 2 <br />0 (C) <br />A= <br />For Non -Testable 71 SO models only <br />In all cases for non -testable 71 SO models, the top of the valve body must protrude at least 6'/2" into the tank to <br />provide a minimal clearance for proper operation.' Additionally the total Upper Tube Length must beat least 16" <br />of length to include the protective bend in the tube. <br />Is C less than 6'/z" Yes / No <br />If NO, Upper Tube Length (D)= C + A <br />If YES, Upper Tube Length (D)= 61/2 "+ A <br />Upper Tube Length = <br />For Testable 71 SO models only <br />In all cases for Testable 71 SO models, the top of the valve body must protrude at least 6'/z" into the tank to provide <br />a minimal clearance for proper operation.' Additionally the total Upper Tube Length must beat least 141/2" of <br />length to include the protective bend in the tube. <br />Is C less than 5" Yes / No <br />If NO, Upper Tube Length (D)= C + A - 1 1/2 " <br />If YES, Upper Tube Length (D) = 6'/2" + A - 1 1/2 " <br />Upper Tube Length = <br />' Sealing surface maybe the top of the Face Seal Adaptoi the built in sealing ledge inside some spill containers, or on non - <br />vapor tight applications the top of the pipe nipple <br />2 Some Underground Storage tanks utilize a man way system at the top. Make sure to use the top of the storage tank for <br />measurementandnottotopofthemanway. Consultyourunderground tank manufacturer for height ofthe man way <br />3 This measurement is taken from the seam where the upper tube is attached to the valve body to the inside of the tank top. <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.