My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2020 1:53:30 PM
Creation date
7/20/2020 11:29:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
FACILITY_NAME
Colonial Energy CE 40134 (DBA Power Mart)
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: Elena Manzo Page 7 of 13 2018-09-05 16:47:04(GMT) 17076380484 From: Nucleus Pump Services <br /> `�. Q UIN Environmental Health Department <br /> APPLICATION FOR UNDERGROUND STORAGE TANK <br /> RETROFIT OR PIPING REPAIR PERMIT <br /> [] 1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned <br /> to the applicant with comments. <br /> [] 2. Include a detailed site map on a separate sheet of paper showing all work to be done. Include the <br /> location of the tanks(s), piping, all tank-related appurtenances, streets, adjacent properties (north toward <br /> the top of the page), nearby septic tanks, leachfields, water wells, buildings, underground public utility <br /> lines (including water, sanitary sewer and storm sewer), and distance of piping from tank to dispensers. <br /> If underground utilities are not included on the site map, you must state in writing that USA Dig will be <br /> contacted prior to excavation activities. <br /> [] 3. Complete pages 3-6, "APPLICATION FOR UNDERGROUND STORAGE TANK RETROFIT OR <br /> PIPING REPAIR PERMIT", NOTE: If sampling is required, sampling firm shall be an independent third <br /> party from the contractor performing the work. <br /> [] 4. Complete page 7, "Authorization to Release". This form must be signed and dated by the <br /> OWNER/OPERATOR of the facility. <br /> [] 5. Submit a completed "Service Request" form and "Underground Storage Tank Program Fee <br /> Worksheet". <br /> [] 6. If performing any excavation activities, and the facility is located outside of the city limits, submit a <br /> "Backfill Excavation Certificate" as required by the San Joaquin County Building Department. If a <br /> "Backfill Excavation Certificate" is required by any incorporated areas (cities), submit to the <br /> appropriate City Building Departments, pursuant to the Uniform Building Code STD 70-11. <br /> [] 7. The maximum review time for Plan Review is 15 working days from receipt of the adequately <br /> completed plan. If gross deficiencies are identified, an addendum will be required with a $152.00 per <br /> hour fee and the review will begin on the date of resubmittal. <br /> [] 8. Advance inspection notice of at least 48 hours is required by the <br /> Environmental Health Department(EHD). <br /> [] 9. Contractor to Provide: Combustible/Flammable gas detector (to verify the Lower Explosive Limit <br /> (LEL) atmosphere and oxygen level), adequate number(s) and appropriate type(s) of fire extinguisher(s), <br /> and barriers to secure the area as necessary to minimize traffic and pedestrian interference. It shall be <br /> the project manager's responsibility for compliance with all health &safety regulations and requirements, <br /> including confined space requirements,which shall be strictly adhered to at all times during the course of <br /> the underground storage tank(UST) activities. <br /> [] 10.The EHD permit shall be on site during all UST permit-related activities. <br /> [] 11. Any changes in this document shall be approved by the EHD prior to initiating work. All changes to <br /> any work must be described in detail on pages 3&4 and be shown on the detailed site map. <br /> 1868 E. Hazelton Avenue J Stockton, California 952051 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.