My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2020 1:53:30 PM
Creation date
7/20/2020 11:29:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
FACILITY_NAME
Colonial Energy CE 40134 (DBA Power Mart)
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDER DISPENSER CONTAINMENT (UDC) TESTING <br /> Test Method By: o Manufacturer • Industry Standard Professional Engr c_ Other(see below) <br /> Test Method Uses: c Pressure vacuum • Hydrostatic Other(see below) <br /> Measuring Equipment Used: INCON TS-STS (Electronic Sump Test System) <br /> Description Disp#5/6 Disp#7/8 <br /> UDC manufacturer Bravo Bravo <br /> UDC material Steel Steel <br /> UDC depth (inches) 9 9 <br /> Height from UDC bottom to highest <br /> piping penetration Bottom Bottom <br /> Height from UDC bottom to lowest <br /> electrical penetration Bottom Bottom <br /> Condition of UDC prior to testing Dry Dry <br /> Portion of UDC tested Entire Entire <br /> Type of shut-down present Sensor Sensor <br /> Was sensor removed for testing? Yes Yes <br /> Was sensor properly replaced after testing? Yes Yes <br /> Depth of water level from UDC bottom (in.) 6 6 <br /> Wait time for water level to stabilize (hr:min) :10 :10 <br /> Test start time 10:32 AM 11:25 AM <br /> Initial Probe Reading 1.4642 0.4074 <br /> Test end time 10:47 AM 11:41 AM <br /> Final Probe Reading 1.4632 0.4082 <br /> Test duration (hr:min) 0:15 0:16 <br /> Change in water level (±0.0000 inches) -0.0010 0.0008 <br /> Pass/Fail threshold (±0.002 inches/:Hr.) 0.0020 0.0020 <br /> TEST RESULT PASS PASS <br /> Comments: <br /> 0 2017 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.