My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2020 1:53:30 PM
Creation date
7/20/2020 11:29:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
FACILITY_NAME
Colonial Energy CE 40134 (DBA Power Mart)
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUNDSTORAGETANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 5 of s) <br />XII. LINE LEAK DETECTOR TESTING <br />❑ Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) <br />This section must be completed if LLDs are installed. <br />Y <br />N NA <br />Was a leak simulated to verify LLD performance? <br />all that apply.) Simulated leak rate verified: ❑X 3 GPH E]0.1 GPH ❑ 0.2 GPH <br />E] El <br />Was the testing apparatus properly calibrated? <br />❑X <br />❑ ❑ <br />For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? <br />❑ <br />❑ X❑ <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? <br />❑X <br />❑ ❑ <br />For electronic LLDs, does the turbine automatically shut off when a leak is detected? <br />❑ <br />❑ ❑X <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />❑ <br />❑ X❑ <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ <br />❑ X❑ <br />For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? <br />❑ <br />❑ X❑ <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />❑X <br />❑ ❑ <br />Were all LLDs confirmed operational within regulatory requirements? <br />X❑ <br />❑ ❑ <br />For any answer of "N" above, describe in Section Xl/l how and when these issues were or will be corrected. <br />XIII. COMMENTS <br />XIV. VACUUM / PRESSURE / HYDROSTATIC MONITORING EQUIPMENT TESTING <br />❑ Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br />This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br />System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br />Sensor ID Component(S) Monitored By This Sensor Sensor Functionality Interstitial Communication <br />Test Test <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />How was interstitial communication verified? ❑ Simulated Leak at Far Ends of the Interstitial Space ❑ Visual Inspection <br />❑ Other Describe the method in section XV below. ❑ Gauge <br />Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑ No (Describe the reason in section XV below.) <br />For any answer of "Fail' above, describe in Section XV how and when these issues were or will be corrected. <br />XV. COMMENTS <br />GPH = Gallons Per Hour, Y = Yes, N = No, NA = Not Applicable, VPH = Vacuum/Pressure/Horostatic, ID = Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.