Laserfiche WebLink
R E F <br /> UNDERGROUND STORAGE TANK nF � 2018 <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 6 of 6) <br /> XVI . MONITORING SITE PLAN _ <br /> Date site map was prepared : U- 1 I fv 1 A, L HEA H <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with bI e ito i $. Stem <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault,0 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment, 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> Monitoring System Certification <br /> _ _ _ USTMonitoringSite Plan <br /> _ __ __ <br /> Site Address__ 1(.�uir_ki Klem Car Wash - 7g7 Yosemite Blvd Manteca <br /> *PIPING s <br /> l7raiviaeofpiping - - <br /> exit 'sump acd <br /> UDCs. \o <br /> tmdarEround Tu <br /> . <br /> dram is - - <br /> accurate, we . . . . . . . . - - . . . . . . . <br /> cannot speculate_ DIE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> blue prints. - _ . . . . . . . . . . . . . . . . _ <br /> ts! ry: <br /> r <br /> X <br /> o <br /> . . . . . . 87 <br /> i _ . • . . . . . . . . . . . . • . . .• .• _- .• .• .- .- . - . .• .- . - . • . .. Car Wash <br /> . <br /> 7B _ 3I <br /> X 3 <br /> a ' <br /> a = �uLAR. <br /> . - F = FILLS <br /> T = TIIRBINE <br /> . - P = PROBE <br /> Z' = TAPOR <br /> c . . . . . . . _ X = SAIPSENSOR <br /> L =, �JTeR <br /> d, drr ireni: rn>ekr� marlih� msraartisiSl.• mdr- cert[( .ingrra;fcfineca .• a at = llhnnap <br /> . . . . (CAS Laying on p-,desstaYrioptaaranji nrrinesole{� fcr ir�onmricrrd n7x ti. Dtma) B USensor <br /> tnttoscds I v,,,,$r"U Sensor <br /> S = STP <br /> C = Floats & Chains <br /> Cafe map was drawn: 104-17. <br /> Instructions <br /> If you already have a diagram that shows all required information. you may include_ it, rather than this page, with your Monitoring System Cerffeation. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipm=ent. if installed: monitoring system control panels; s=ensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas: mechanical or e`ecironic line leak detectors; and in-tank liquid levef <br /> probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2+21 ,'07 <br /> LEGEND <br />