Laserfiche WebLink
r <br /> State Water Resources Control Board <br /> t 1;7t <br /> DMsion of Clean Water Programs <br /> B a 2014T Street•Sacramento,California 95814•(9 i'6)227-4411 �•• <br /> Winston H. Hiekox Q �j Q Mailing Address: P.O.Box 944212•Sacramento,Calif6mia•94244-2120 Gray Davis <br /> i Secretary for } �!"'FA�C.Q9l sl227�4$3 i lntemet Address: http://www.swrcb.ca.gov/ cwphome/ustcf <br /> Environmental Governor <br /> Protection <br /> I <br /> Craig Ogatta <br /> San Joaquin County <br /> 1722 Scott Ave E <br /> Stockton, CA 95205 <br /> "-UI�DERGRO- LE-ANU"UND CLAIM INC5-00 14;FOR`SITE ADDRESS: <br /> _ 444 WILSON WAY S, STOCKTON <br /> The State Water Resources Control Board(State Board) is able to issue,pursuant to applicable <br /> regulations, the enclosed Letter of Commitment(LOC) in an amount not to exceed$40,000. This LOC is <br /> based upon our review of the corrective action costs you reported to have incurred to date. The LOC may <br /> be modified by the State Board. <br /> I i <br /> It is very important that you read the terms and conditions listed in the enclosed LOC. Claims filed with <br /> the Underground Storage Tank Cleanup Fund far exceed the funding available and it is very important <br /> that you make use of the funding that has been committed to your cleanup in a timely manner. <br /> You are reminded that you must comply with all regulatory agency time schedules and requirements and <br /> you must obtain three bids for any required corrective action. Only corrective action costsrequired by <br /> the regulatory agency to protect human health, safety and the environment can be claimed for <br /> reimbursement. Unless waived in writing,you are required to obtain preapproval of costs for all <br /> future corrective action work(form enclosed). If you have any questions on obtaining preapproval of <br /> your costs or the three bid requirement,please call Yulya Davidova our Technical Reviewer assigned to <br /> claims in your Region, at(916) 227-4518. Failure to obtain preapproval of your future costs may result <br /> in the costs not being reimbursed. <br /> The following documents needed to submit your reimbursement request are enclosed: <br /> • "Reimbursement Request Instructions" package. Retain this package for future <br /> reimbursement requests. These instructions must be followed when seeking reimbursement for <br /> corrective action costs incurred after January 1, 1988. Included in the instruction package are <br /> samples of completed reimbursement request forms and spreadsheets. <br /> • "Bid Summary Sheet" to list information on bids received which must be completed and <br /> returned. <br /> • "Reimbursement Request" forms which you must use to request reimbursement of costs <br /> incurred. <br /> • "Spreadsheet" forms which you must use in conjunction with your reimbursement request. <br /> California Environmental Protection'Agency <br /> �a Recycled Paper <br />