Laserfiche WebLink
DYNAMIC BACK PRESSURE TEST DATA (BLOCKAGE) TECHNICIAN: ZANE NIMMO <br /> Cert#0083 Exp. <br /> Site: WEST LANE CHEVRON Date: 9/19/2018 Time: <br /> Nozz/Fuel 20 CFH 60 CFH 100 CFH PASS/FAIL Nozz/Fuel 20 CFH 60 CFH 100 CFH PASS/FAIL <br /> Grade (.15"Water) (.45"Water) (.95"Water) Grade (.15"Water) (.45"Water) (.95"Water) <br /> -- 60CFH 80CFH --- 60CFH 80CFH --- <br /> 1 ALL -- .24 .38 PASS 2 ALL -- .26 .40 PASS <br /> 3 ALL -- .28 .46 PASS 4 ALL -- .35 .52 PASS <br /> 5 ALL -- .26 .42 PASS 6 ALL -- .28 .44 PASS <br /> 7 ALL -- .24 .43 PASS 8 ALL -- .26 .45 PASS <br /> LIQUID REMOVAL CHECK **See Long Form Test Report for Wet Failure Testing Blockage Tester Integrity: <br /> D=Dry 1 .4w.c.4D,5 minutes PASS <br /> I ®DRY 2 ®DRY 3 ®DRY 4 ®DRY 5 ®DRY 6 ®DRY 7 ®DRY 8 ®DRY ❑DRY <br /> ml ml ml ml ml ml ml ml ml <br /> ❑DRY []DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY <br /> M1 ml ml ml ml ml ml ml ml <br /> ❑DRY []DRY ❑DRY ❑DRY []DRY ❑DRY []DRY ❑DRY ❑DRY <br /> M1 ml ml ml ml ml ml ml ml <br /> ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY []DRY [-]DRY <br /> M1 ml ml ml ml ml ml ml ml <br /> ® Job Complete Repairs Done to Pass Test: <br /> ❑ Not Complete Repairs Still Needed: <br /> Parts: None Drop Tube rings Fill Adaptor Gaskets Hoses Whip Hose <br /> Nozzles Breakaways PV Valves I I Others: <br />