Laserfiche WebLink
fforda—Te t416 2"d Street <br /> Galt, CA 95632 <br /> (209) 744-0113 Fax (209) 744-0116 <br /> E.O. V12-203/204 <br /> Veeder-Root Vapor Polisher Operability Test Form <br /> Permit Number:N-2522 Date of Test: 9/19/2018 Time: <br /> Site Name: WEST LANE CHEVRON <br /> Site Address: 4747 WEST LANE <br /> City: STOCKTON, CA Zip: 95210 Technician: ZANE NIMMO <br /> VST: 3000839502 <br /> District: SJVAPCO Veeder-Root: A28446 <br /> Calibration Date: daily <br /> TEST INFORMATION <br /> Calibration date for digital manometer(must be within 6 months of the test) 7/13/2018 <br /> Ending value for digital manometer drift test(must be 0.01 in.w.c.or less) .00 <br /> Calibration date for thermometer(must be with 6 months of the test) NCO A <br /> Vapor polisher valve close date and time(must have been closed for at least 2 hours) 9/19/2018 1 0855 <br /> Atmospheric pressure sensor serial number 3 0 6 1 <br /> PRESSURE INTEGRITY TEST <br /> Nitrogen gas flow rate(scfh) 15 SCF H <br /> Starting pressure(in.w.c.) 8.01 <br /> Final pressure at 1 minute(in.w.c.) 8.13 <br /> Is the final pressure>7.0 in.w.c.? Yes <br /> Is the difference between the starting and final pressure<0.5 in.w.c.? Yes <br /> NOTES: 'If the final pressure is not > 7.0 in. w.c. and the difference is not < 0.5 in. w.c., then the vapor polisher is not in <br /> compliance. <br /> FLOW TEST <br /> Nitrogen gas flow rate(scfh) 18 S C F H <br /> Pressure(in.w.c.) 1.88 <br /> Is the pressure between 1.69 and 2.25 in.w.c.? Yes <br /> NOTES: 'The flow rate must be 18.0 t 0.2 scfh. <br /> 'The pressure must be between 1.69 and 2.25 in.w.c.or the vapor polisher is not in compliance. <br /> 'Three-way valve must be returned to normal(open)operating position after testing is completed. <br /> VMC valve mode must be re-set to automatic after testing is completed. <br /> I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed <br /> after reasonable inquiry, the statements and information provided in this document are true, accurate, and complete. <br /> Signature of Technician: Date: 9/19/18 <br /> Ver.1.1—01.20.09 <br />