My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4747
>
2300 - Underground Storage Tank Program
>
PR0232482
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2020 2:04:15 PM
Creation date
7/20/2020 1:37:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0232482
PE
2361
FACILITY_ID
FA0003719
FACILITY_NAME
WEST LANE CHEVRON
STREET_NUMBER
4747
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
10437010
CURRENT_STATUS
01
SITE_LOCATION
4747 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testing/Servicing <br /> Software version Installed: 3 2 9 0 1 <br /> Com fete the following checklist: <br /> ® Yes ❑ No* Is the audible alarm operational? <br /> ® Yes ❑ No* Is the visual alarm operational? <br /> ® Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? <br /> ® N/A <br /> ® Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br /> ❑ N/A fails to operate,or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) ®Sumplrrench Sensors; <br /> ®Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor fail ure/disconnection? ®Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e., no mechanical overfill prevention valve is <br /> ® N/A installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? if so,at what percent of tank capacity <br /> does the alarm trigger? % <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts in Section E,below. <br /> []Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. if yes,describe causes in Section E,below. <br /> ® Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ® Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System Certification Page 2 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.