Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site address: West Lane Chevron 4747 N West Lane Stockton,CA 95210 <br /> Bianchi <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . <br /> KEY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> A=ANNULAR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> F=FILLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> T=TURBINE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Canister . . . <br /> P=PROBE . . . . . . . . . . . . . . . . . . . . . A . . . . . . . . . . . . . . . <br /> V=VAPOR . . . . . . . . . . . . . . . . . . . . . O . . . . . . . . . . . . . . . <br /> X=SUMP SENSOR F . . . . . . . . . . . . . <br /> L=Leak Detector P W <br /> M=ManwaY e <br /> B=Brine Sensor <br /> I=Smart SensorA s <br /> S=STP . . . . . . . 91 F . . . . . . . . t <br /> C=Floats&Chains <br /> E=E Stop . . . . . . . . . . . . <br /> TL p . . . . . L <br /> . . . . <br /> X A a <br /> 87 n <br /> F <br /> . . . . . . . . . . . . . . . . . . . . . . . ., e <br /> TL P <br /> X <br /> . 87 <br /> . . . . . . . . . <br /> . . . . . . . . . . . . <br /> . . . . . . . . . TL . . . . . . . . <br /> X *PIPING <br /> 8. (ARROWS) <br /> X Drawing of <br /> piping exit of <br /> . . . . . . . . . . . . . VRA . . . . . . . . sump and round <br /> [� No underground <br /> drawing is <br /> . . . . . . . . . . . . . . X 1 . . . . . . . . . . accurate,we <br /> . . . . . . . . . cannot speculate <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . blue prints. <br /> . . . . . . . . . . . . . . . . . . . . . . <br /> 6. X . . . . . . Store . . . . . . . . . . . . . . . . . . <br /> .s X .4 . . . . . . . . . . . . . . . . . <br /> E Stop. . . . . . . . . . . . . . . . . . . . . <br /> F6 <br /> Any items underground that are not visible to the certifying technician are a <br /> professional opinion only and are solelyfor informational purposes. Drmving <br /> not to scale <br /> Date map was drawn09/26-17 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />