Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC) TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer L Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> UDC# 1&2 UDC#3&4 UDC#5&6 UDC#7&8 <br /> UDC Manufacturer: APT APT APT APT <br /> UDC Material: Poly Plastic Poly Plastic Poly Plastic Poly Plastic <br /> UDC Depth: 27" 27" 31" 27" —- <br /> Height from UDC Bottom to Top 12 %" 12 %2" 12 '/2" 15" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 5 %Z" 6 %2" 7" 5 ''/2" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry Dry Dry <br /> testing: <br /> Portion of UDC TestedWater Line 17" Water Line 17" Water Line 17" Water Line 19" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both Yes Yes Yes Yes <br /> product and water)?* <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail- Yes Yes Yes Yes <br /> safe shutdown?' <br /> Was fail-safe verified to be No No No No <br /> operational?* <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> water and starting test <br /> Test Start Time: 8:52 9:37 9:42 9:47 <br /> Initial Reading (RI): .001 .001 .001 .001 <br /> Test End Time: 9:22 10:07 10:12 10:17 <br /> Final Reading(RF): .001 .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Chane in Reading RF-RI): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass Pass Pass <br /> Was sensor removed for testin ? Yes Yes Yes Yes <br /> Was sensor properly replaced and Yes Yes Yes Yes <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommendedfollow-upforfailed tests <br /> IUL. 2 2 <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to an of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />