My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
9484
>
2300 - Underground Storage Tank Program
>
PR0232601
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2024 11:22:08 AM
Creation date
7/20/2020 2:07:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0232601
PE
2361
FACILITY_ID
FA0004525
FACILITY_NAME
CHEVRON STATION #372736/2223
STREET_NUMBER
9484
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09055063
CURRENT_STATUS
01
SITE_LOCATION
9484 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.In-Tank Gauging/SIR Equipment: F Check this box if tank gauging is used only for inventory control. <br /> r Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Yes No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes No* Was accuracy of system product level readings tested? <br /> Yes (' No* Was accuracy of system water level readings tested? <br /> Yes No* Were all probes reinstalled properly? <br /> Yes No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> • Yes No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance?(Check all that <br /> N/A apply)Simulated leak rate:P 3 g.p.h.; r 0.1 g.p.h; 1 0.2 g.p.h. <br /> + Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> • Yes ( No* Was the testing apparatus properly calibrated? <br /> P. Yes r No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> r N/A <br /> Yes r No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> !T- N/A <br /> • Yes (' No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> �.. N/A monitoring system is disabled or disconnected? <br /> • Yes f No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> (., N/A monitoring system malfunctions or fails a test? <br /> • Yes r No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> • N/A <br /> • Yes No* kere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.