Laserfiche WebLink
by GR Job# 18201789 <br /> X4J Emergency Shut-Off (ESO) Testing Results & Checklist <br /> Facility Information Contractor Information TEST Results <br /> Site#Arco 7149 Co. Name: Gettler-R an Inc. Date:6/2 0/2 018 <br /> Address: Phone 925-551-7556 <br /> 9484 West Lane Lead Technician:David Rouse x PASS <br /> City/St:Stockton, CA Name: _ or <br /> eMaint.W.O.# 1 5 5 Passport: FAIL(Next Day Repair Required) <br /> Signature <br /> The objective of this test Is to provide assurance that the when the E-Stop switch is activated,all the fueling system clrcults(turbines,and dispensers)are de-energized,an <br /> remain de-energized until they are re-set manually). The test procedures and guidelines shall be In accordance with the Estop Testing Process. <br /> # The following Information/s to be completed. <br /> X To select <br /> Ya No A <br /> SITE DATA <br /> 1 Number of E-Stopswitches: 1 <br /> 2 Type of Switch? Push Pull_U MomentaryPlain light/Toggle]EL Other: <br /> (if Momentary type, locate and identify re-set button): In Elect Room <br /> 3 Type of Turbine Control Relay System (Electrical Distribution Center): <br /> 11 Brown Box 0 Power Solution -M Other Custom Fabricated <br /> a T e of Turbine Control Relays: Make R d Model 2-1 1 <br /> 5 1 Type of Line Leak Detection: Mechanical ELD/CPT V I PLLD <br /> PERFORMANCE TEST <br /> 6 Does the E-Stop shutdown power to the DISPENSERS <br /> 7 Does the E-Stop shutdown power to the TURBINES X <br /> 8 Is the 220 voltage to the turbine relay removed(either the line side or the motor side of the contacts or the coil)? :,,t <br /> 9 Are the DISPENSER BREAKERS clearly identified/labeled? A <br /> 10 Are the TURBINE BREAKERS clearly identified/labeled? <br /> 11 Are all the ESOs accessible and clearly identified/labeled? <br /> X ; <br /> 12 Did the ESO(s)function correctly(de-energized from either the line side or the motor side of the contacts or the coil)? X <br /> 12A If#12 is NO, briefly describe what was wrong: <br /> 128 How was it corrected: <br /> 12C If repair or ESO functionality cannot be corrected same da .r. <br /> p y y(prior to leaving the site). The technician MUST notify the ' <br /> Y T <br /> Site Manager of the problem, place an"Out of Service"Tag on the ESO(s), and identify an alternate mean (i.e., locate <br /> circuit panel, clearly identify turbine and dispenser breakers for shut-off in the event of an emergency). <br /> 12D Elite Customer Solution Center has been contacted for the repair. <br /> eMaint.W.O.Ticket# <br /> POST TEST <br /> 11 Site's fueling system is fully operational. x <br /> 12 JAII equipment secured and any access ports, lids, enclosures are closed. x s� <br /> 13 JAII safety barricades,and any debris was been removed. x ".r <br /> COMMENTS ; <br /> JUL 13 2Q18 <br /> ENVIRONMENTAL <br /> HEALTH LGP RTn..IENT <br /> Submit completed copy with other documentation in E-Maintenance. <br />