My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
444
>
3500 - Local Oversight Program
>
PR0544618
>
WORK PLANS_CASE 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 8:45:52 AM
Creation date
7/21/2020 8:42:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
CASE 3
RECORD_ID
PR0544618
PE
3528
FACILITY_ID
FA0006456
FACILITY_NAME
SJ CO MOTOR POOL SHOP
STREET_NUMBER
444
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15505005
CURRENT_STATUS
02
SITE_LOCATION
444 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> kl4KLEINFELDER 1 <br /> i File No. 20-1008-52.A01 <br /> May 16, 1994 <br /> 1 <br /> f I� <br /> The samples will be analyzed on a normal laboratory schedule requiring approximately one to <br /> two weeks (five to ten working days) for completion. <br /> 'i <br /> l <br /> The soil boring will be advanced using a truck-mounted drill rig equipped with 8-inch hollow <br /> stem augers. The borings will be drilled, logged, and samplled following the protocol described <br /> in Attachment A. Following completion of the drilling, the borings will be backfilled following <br /> protocol described in Attachment A. <br /> Task A03 - Reporting <br /> Upon completion of the field activities and receipt of the analytical results, a report of findings ` <br /> .r � <br /> will be prepared for client and agency review. The report will include: <br /> II � <br /> • A description of the field activities observations and protocols <br /> p p ''I f <br /> r <br /> • Lithologic logs <br /> i <br /> II <br /> • Tabulated results of soil samples with copies of certified 'analytical results <br /> • Description and documentation of QA/QC procedures employed for field and <br /> laboratory work f <br /> f <br /> • Kleinfelder's conclusions and recommendations based on the data acquired } <br /> II a <br /> f <br /> The attached cost estimate summarizes the costs for the four 'soil borings. If additional services <br /> F <br /> are required, our cost estimate could be further refined. r <br /> ASSUMPTIONS AND CLIENT RESPONSIBILITIES <br /> I <br /> • This proposal will be adequate to obtain authorization frm the SJCEHD. If a more F <br /> comprehensive workplan is necessary, additional charge for workplan preparation <br /> will be incurred. <br /> E <br /> i <br /> • Adequate work space and access will be provided. Kleinfelder will attempt to <br /> advance the soil borings at the proposed locations. If this drilling equipment cannot { <br /> be positioned, alternative drilling locations or sampling methods should be <br /> investigated. The borings are to be drilled with a truckmounted drill rig equipped l <br /> with hollow stem augers. If alternative drilling methods or concrete cutting are <br /> required, additional costs may be incurred. <br /> P <br /> d <br /> ETH:md IE/94 ' <br /> Copyright 1994 Kleinfelder, Inc. Page 3 of 5 <br /> H <br /> j <br />
The URL can be used to link to this page
Your browser does not support the video tag.