My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4648
>
3500 - Local Oversight Program
>
PR0545864
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 9:10:29 AM
Creation date
7/21/2020 8:48:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545864
PE
3528
FACILITY_ID
FA0004530
FACILITY_NAME
MARLOWE PROPERTY
STREET_NUMBER
4648
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
4648 WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br /> 19 October 2007 <br /> AGE-NC Project No.95-010 <br /> Page 5 of 6 <br /> 3.4. WELL DEVELOPMENT AND SURVEY <br /> Development of the proposed wells will consist of a combination of bailing'with a stainless steel <br /> bailer to remove:the major portion of e-grainerl sediment from inside the-well,,surging to flush <br /> out-or draw in sediment from the filter pack anti additional groundwater evacuation(purging)-with. <br /> a,sible pump to finish the removal of,fine-giried sedimient.Developmental purging activities <br /> will bie-,eontinued until field parameter(pH;electrical conductivity,and temperature)feedings have <br /> sized and purged water is visually sediment:free. <br /> Adds ionally,the well-head.eleva(ions and will be surveyed by a:California.licensed surveyor. <br /> . 3.5; EQUIPMENT DECONTAM NATIOri <br /> Ail aampling:toois used for salecollect aion'will,he thoroughly rinsed with� clean water after being <br /> wh witha solution-ifAlconox .All down-hole drilling and sampling equipment will be pressure <br /> washed prior to starting the boring: <br /> 3.6. GROUND WATER MONTI'OltlNG PROCEDURES <br /> Gioundwatersample collection will,be performed in accordance with.EHI)guidelines(San Joaqutn <br /> County Environmental Health Department Well gtm dls)-and CVRWQCB guideluLes (7'ri- <br /> Reg rtal mar r al ly Control Boged Recommen4dotts.for..Preliminary'Investigations arid. <br /> Evaluation of fUn rground Storage Tanks) samplingitocols. <br /> 3.ba. :Static_Water V.el Me <br /> asprements <br /> Pxior to all mud water purging and sampling, static wster levels in�each.wefi vdlt be measured <br /> using an electricwater level indicator.W'aterlevel daft will..be recorded tothe nearest 0.01 foot from <br /> a.-�e poiat marl don the.top of.each PVC well casing. before and:Aer each use, the <br /> went device will be fin .;with Clean tap water: <br /> 1.0.2. Well Evacuation <br /> %ftequentW t o€depth&700 water and-prier to sampling,each well will be}urged using <br /> a bailer orsub Bible.pump to efture that the s p- is'jrepresentative of the surrounding aquifer <br /> pound<water.T1w welt will`lie.perged ifntW;1}a minimum oft casin' Volumes;is removedfior <br />
The URL can be used to link to this page
Your browser does not support the video tag.