My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008413
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4648
>
3500 - Local Oversight Program
>
PR0545864
>
ARCHIVED REPORTS_XR0008413
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 10:00:58 AM
Creation date
7/21/2020 9:46:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008413
RECORD_ID
PR0545864
PE
3528
FACILITY_ID
FA0004530
FACILITY_NAME
MARLOWE PROPERTY
STREET_NUMBER
4648
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
4648 WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 5 <br /> Soil and Ground Water Corrective Action Alternatives <br /> MARLOWE PROPERTY <br /> 4648 E Waterloo Road, Stockton, California <br /> Estimated Costs Typical Es imated <br /> Method Advantages D.sadvantages (incl Monitoring Monitoring D i anon <br /> and Maintenance Requirements <br /> In-situ •Relatively simple design and •Usually no immediate $105,000 to Monthly ground water 24 to �6 <br /> Bioremediation application process•Little or no reduction in hydrocarbon $135,000 total cost and vapor sampling, mon s <br /> (Ground Water) maintenance required concentrations•Remediation quarterly monitoring, <br /> controls difficult to implement microbiological <br /> Section 7 3 •Regulatory acceptance analysts of samples <br /> f difficult to obtain•Waste <br /> discharge permits sometimes <br /> requ i red <br /> Natural •Lower costs than most active •Not effective for higher Quarterly ground Unknown <br /> Attenuation remedial alternatives•Minimal contaminant concentrations• water monitoring <br /> disturbance to the site• Migration of contamination <br /> Section 7 4 Potential use below structures may occur•Longer time frame <br /> than active remedial ion•May <br /> not achieve cleanup levels <br /> within reasonable length of <br /> Lime•Not generally permitted <br /> when fret product is present <br />
The URL can be used to link to this page
Your browser does not support the video tag.