My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008453
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4648
>
3500 - Local Oversight Program
>
PR0545864
>
ARCHIVED REPORTS_XR0008453
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 10:00:02 AM
Creation date
7/21/2020 9:53:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008453
RECORD_ID
PR0545864
PE
3528
FACILITY_ID
FA0004530
FACILITY_NAME
MARLOWE PROPERTY
STREET_NUMBER
4648
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
4648 WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30 December 1999 <br /> AGE-NC Project No 95-0104 <br /> Page 5 of 7 <br /> Field measurements are summarized in Table 4 <br /> 44 ANALYTICAL RESULTS OF SOIL GAS SAMPLES <br /> During the SVE pilot test, TPH-g was detected in soil gas samples collected from VW-1 at <br /> concentrations ranging as high as 2,880 ug/l <br /> BTEX compounds were detected in soil gas samples collected from VW-1 at concentrations as high <br />' as 240 ug/l Benzene was detected in the first three soil gas samples collected during the test at <br /> concentrations as great as 16 ug/l, but has not been detected In the last eight soil gas samples <br /> collected Analytical results of soil gas samples are summarized in Table 3 The laboratory report <br /> (Precision Enviro-Tech Analytical Laboratory Sample 1 D 's PE5851, PE5877, PE6042, PE6094, <br /> PE6145,PE6210, PE6350, PE6429, PE6492, PE6561, PE6651 and PE6674) and chain-of-custody <br /> forms are presented in Appendix D <br />' 45 MASS CALCULATION OF RECOVERED PRODUCT <br /> The hydrocarbon mass removed during the operating period was calculated using the following <br />' equation M = C•Q•t <br /> where M =cumulative mass recovered (kg) <br />' C = vapor concentration (kg/m') <br /> Q = extraction flow rate (m3/hr) <br /> t= operational period, in hours <br />' Between 27 August 1999 and 14 December 1999, the extraction unit operated a total of 2,520 hours <br /> The analytical results of the vapor samples combined with average flow rates (approximately 60 cfm) <br />' and the operational period were used to calculate the approximate mass of extracted gasoline during <br /> these periods <br />' The mass of hydrocarbons extracted from VW-I between 27 August 1999 and 14 December 1999 <br /> was calculated to be approximately 59 15 gallons The mass calculations for the pilot test are in <br />' Appendix E. <br />' 5 0. DISCUSSION AND CONCLUSIONS <br /> • Based on data collected dunng the November 1999 ground water monitoring event, AGE concludes <br />' Advanced GeoEn\Ironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.