My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4907
>
3500 - Local Oversight Program
>
PR0545865
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 10:02:50 AM
Creation date
7/21/2020 9:57:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545865
PE
3528
FACILITY_ID
FA0009358
FACILITY_NAME
COZAD TRAILER SALES LLC
STREET_NUMBER
4907
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710068
CURRENT_STATUS
02
SITE_LOCATION
4907 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 _ <br /> .T131 c'8 191 10: 1:3 =l'i� 6^ � � � <br /> „�- �- ��t-'.3 HLA C't=,I�a�f.�F'La � <br /> u <br /> I <br /> I <br /> Harding Lawson As,00Wes <br /> I - <br /> June 28, 1.991 <br /> i <br /> 20548, 001.03 i <br /> San Joaquin County <br /> Public Health Services <br /> Environmental Health services <br /> P.O. Box 2009 <br /> StoCkton, California 95201. <br /> Attention: Ms. Margaret Lagorio <br /> Ladies and Gentlemen: <br /> Work Plan Amendment � <br /> Soil and Groundwater Investigation <br /> Cozad Trailers <br /> Stockton, California <br /> This letter presents amendments to a work Plan dated June 14, <br /> 1991, for a soil and groundwater investigation at the Cozad <br /> Trailer manufacturing facility, During 0ur ,telephone <br /> Conversation on June 26, 1991, you requested, additional <br /> information concerning the above refereraced 'Work Plan. The <br /> following paragraphs present this additi�o.nal: information. <br /> Purged groundwater generated from developing the <br /> monitoring wells will be contained. in 55-gallon <br /> Department of Transportation certified drums. After <br /> receiving analytical results, :` proper disposal method <br /> will be selected. <br /> A typical well construction detail diagraza is <br /> attached. As shown on the diagram', the well top of <br /> casing is housed in a 12-inch imco-Wheaton monitoring <br /> well how. Additionally, a lockingil expansion plug <br /> seals the top of the casing. <br /> I <br /> Soil samples will be collected at five .foot intervals <br /> from each well boring and every sample will be <br /> screened with a photoionizatioh device (PTD) . The two <br /> soil samples with highest PTD readings will be <br /> submitted for chemical analysis. if no positive <br /> readings are detected by the PTD while screening the <br /> soil samples, we will then subinit soil samples from <br /> Er,q-teenno*rip 1355 Mlwi Vijay, cuitg 100,ccrccrd,::r` 94U0 {15/t -9660 <br /> Cry. r nentel SG.rvi�C, I q.i h-d" r r/HardJ,rg iic 06''x s.O%f'rr Alurrun•tidr <br /> �I <br />
The URL can be used to link to this page
Your browser does not support the video tag.