Laserfiche WebLink
tti <br /> Gemini Petrographic IM29 ations <br /> SITE HEALTH AND SAFETY PLAN <br /> � As required by 29 CFA 1910.120, GPI has prepared a Site Health and Safety Plan(Appendix D) basad on <br /> site condltlons and suspected contaminants. The Health and Safety pian was prepared by a staff geologist <br /> and reviewed by the project manager. Our field work will be preformed In accordance with tho site specific <br /> Health and Safety Plan,and GPI's In-house Health and Safety Manual. <br /> TASK 2: SOIL SAMPLING <br /> The purpose of Task 2 is to quailtativeiy assess the characteristics of site s4','.and to evaluate the existence of <br /> sol]contamination. <br /> GPI will notify the San Joaquin County Public Health Services,Environmental Health Division at least 48 hours <br /> before drilling the proposed borings. GPI proposes to drill one(1)soil boring yYlthin within the vicinity of the <br /> underground storage tanks to a minimum depth of 40 feet(pre-1988 groundwater level)and to a maximum:. <br /> depth at which at least two consecutive soil samples show no field evidence of contamfnatlon(estimated at <br /> 50 feet)at the location as shown in Plate 1. The proposed boring location would be downgradlent from the <br /> excavated diesel tank and within the groundwater direction envelope In relation to the excavated gasoline tank. <br /> The proposed boring In.this location would be within 10 feet of the excavated gasoline tank,and within 15.20 <br /> feet of the excavated diesel tanks. If contamination has occurred,either verticaliytransported by groundwater. <br /> and/or precipitation or laterally migrated through the soil profile,the location of the baring would most likely <br /> .., intercept the contamination, If any. . Detailed boring procedures, site and equipment decontamination <br /> procedures,soil waste handling protocol are outlined In Appendix A. Solis encountered In the boring will be �G <br /> sampled,every five (5)feet,or at changes in iitholo -il <br /> .V gy, or areas of obvious contamination to the maximum a� <br /> boring depth. If soil contamination is detected at the 40 foot level,drilling and sampling will continue until fieldr <br /> evidence Indicates the non-contaminated soil has been reached and/or bedrock Is encountered. Confirmation <br /> samples from the f[nal depth w1V be submitted to a state certified?a boratory for analysis.AHNUPhotoionization ,- <br /> Detector(PID)will be used to screen the soil samples for hydrocarbon compounds and to guide selection of v <br /> soil samples for analyses. The soil boring will he backfilled with a cementlgrout mixture and repair to the any <br /> overlying structures will complete the sampling phase. p <br /> TASK 3: LABORATORY ANALYSIS V°' <br /> Soil samples will be delivered under chain-of-custody protocol to a state certified laboratory, The proposed <br /> analyses will include Total Petroleum Hydrocarbons(as Gasoline)using EPA method 8015 and BTX&E EPA J <br /> Method 8020(See Table 1), We anticipate using Superior Analytical Laboratory,Inc.of San Francisco as our <br /> analytical laboratory, y �X <br /> TASK 4: DATA INTERPRETATION AND REPORT PREPARATION <br /> GPI will review the results of Tasks 1 through 3 and assess whether or not contamination was discovered <br /> during the preliminary Investigation: The types of contamination detected (If any) and locations will be <br /> evaluated. <br /> _� 3 <br />