My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
222
>
3500 - Local Oversight Program
>
PR0545869
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 10:37:04 AM
Creation date
7/21/2020 10:30:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545869
PE
3528
FACILITY_ID
FA0003764
FACILITY_NAME
SJ COUNTY COURT HOUSE
STREET_NUMBER
222
Direction
E
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
14916001
CURRENT_STATUS
02
SITE_LOCATION
222 E WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> RAMAGE ENVIRONMENTAL <br /> RECOVE"D <br /> Site Health and Safety Plan <br /> NOV 2 8 2000 <br /> ii ENVIRONMENT HEALTH <br /> I. GENERAL INFORMATION PERMIT/SERVICES <br /> 1 <br /> Date: November 28,2000 <br /> t Project Name: San Joaquin County Courthouse <br /> Project Site Location: 222 E. Weber Avenue, Stockton, California <br /> i; <br /> Client Contact: Ms. Kerry Wasson Phone: (209) 468-9625 <br /> Facilities Management <br /> San Joaquin County <br /> Project Manager: Joseph Ramage Date: <br /> { The Project Manager is responsible for all onsite activities, including having all appropriate plans <br /> prepared and distributing the plans to field personnel and to authorized representatives of each <br /> { subcontractor employed to perform work on site. The Project Manager is also responsible for <br /> ensuring that the provisions of the Health and Safety Plan(HSP) are carried out. This includes <br /> i ensuring that all field personnel have received adequate training, that an adequate supply of <br /> safety and emergency equipment is available. <br /> Designated Site Safety Officers: Joseph Ramage i' t - Date: d-Z210C <br /> The Site Safety Officer (SSO) is responsible for implementing the!site health and safety plan. <br /> This includes ensuring that field personnel have read and signed the HSP, and that a Tailgate ; <br /> Safety Meeting is conducted on site each day prior to initiating field activities. In addition,the <br /> SSO will be responsible for auditing the site operations for campli'ance with the health and safety <br /> plan and any applicable federal, state or local requirements. ,The S.SO is required to be on site at <br /> ' <br /> all times. In the SSO's absence, a designated alternate will assume the duties and <br /> responsibilities. <br /> Work Objectives/Scope: Conduct soil and groundwater investigation related to a farmer <br /> underground storage tank(UST). For this investigation, soil and groundwater grab samples will <br /> be collected from three (3) soil borings using a Geoprobe 5400 Direct Penetration Technology <br /> (DPT) rig. <br /> s. <br />
The URL can be used to link to this page
Your browser does not support the video tag.