My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
3302
>
3500 - Local Oversight Program
>
PR0545872
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 3:41:07 PM
Creation date
7/21/2020 3:26:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545872
PE
3528
FACILITY_ID
FA0025947
FACILITY_NAME
JAYS MINI MART
STREET_NUMBER
3302
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11705037
CURRENT_STATUS
02
SITE_LOCATION
3302 N WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEERING, INC. <br /> RCE#27011 Lic.#537901 <br /> May 6, 2003 Q <br /> D <br /> Ms. Margaret Lagorio <br /> San Joaquin County Environmental Health Division <br /> 304 E. Weber, Third Floor R[ECF <br /> Stockton, CA 95201-0388 <br /> MAY 0 9 2003 <br /> SUBJECT: SCHEDULE FOR SITE INVESTIGATION ACTIWN1VEN� 11EAL1 H <br /> _ WEST LANE FUEL, 3302.WEST T LANE <br /> �ITjSEPN1'CES <br /> Dear Ms. Lagorio: <br /> As discussed in our meeting of May 6, 2003, I am submitting the following schedule of site <br /> investigation activities for the West Lane Fuel site located at 3302 West Lane, Stockton, <br /> California:, . <br /> May 9, 2003 Submit permits for well construction to San Joaquin County. <br /> May 22723;2003 --Drill and install approved on-site soil borings (convert to wells <br /> If necessary). <br /> May 22-23, 2003 -- Take soil and groundwater samples from borings. <br /> May 23, 2003 -- Develop wells(only if wells are installed). <br /> May 26, 2003 - Sample new wells (only if wells are installed). <br /> May 26, 2003 -- Submit all samples to laboratory for analysis. <br /> June 6, 2003 --Expected date for preliminary analytical results. <br /> July 1, 2003 (or sooner) -- Submit report of results of well installation and pump test. <br /> _ Following-our May 6 meeting, I was able to move up the drilling to May 22-from June 2 to <br /> assure vve will.have all-informafion necessary to meet the`July-1 reporf-d`ea�hne: - <br /> Please contact me should you have any questions or require further information. <br /> Thank you, t <br /> Thomas E. Ballard, R.G. <br /> Executive.Director <br /> pc: Mr. Jay Mcllrath <br /> David Irey, Office of the District Attorney <br /> F A51871TB11n1WestLaneSch050603 <br /> 11960 Heritage Oak Place • Suite 2B •Auburn, CA. 95603 (530)886=3100 (800)877-1739 fax: (530)886-3108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.