Laserfiche WebLink
f <br /> � BTEX with a detection limit of 0 . 5ug/1 asjrequired by the S,;JCEHD. <br /> Oxygenates will be analyzed via EPA protocol 8260. <br /> All samples will be analyzed at McCampbell Analytical, a <br /> California State Certified Laboratory. <br /> Task 5 <br /> JPCA will measure the groundwater depth in the three monitoring <br /> I wells with an electronic probe prior to purging. A survey 'to <br /> �. establish the well heads elevation with respect to each other <br /> will be completed. The gradient will be calculated for the site } <br /> based on depth to water data collected and surveyed top of the <br /> casing elevations. r <br /> Task 6 <br /> A report will be prepared to document the results of the <br /> investigation and the laboratory analyses'lof the samples. The <br /> report will include a summary of the field work, boring logs, COC <br /> documentation, certified analytical results , conclusions a,nd <br /> recommendations regarding the potential environmental <br /> liabilities, if any, at the site. One copy of the report will be <br /> submitted to the client. <br /> i ESTIMATED COSTS and SCHEDULE <br /> In order to perform the Scope of Work generally outlined above, <br /> JPCA proposes a budget of $23, 686.00 for the environmental <br /> assessment based on the assumptions listed below. The costs <br />! include Professional fees, driller charges, travel, per diem, <br /> equipment rental, chemical analyses and report preparation. ;; Any <br /> additional work will be negotiated and additional costs agreed on <br /> prior to that additional work being completed. A copy of JPCA <br /> Fee Schedule is enclosed. <br /> 1 1. The-depth- to groundwater and the'—gradient "are -generally "as <br /> assumed. <br /> i 2 . Soil cuttings are not contaminated and -pan be disposed of on <br /> site. Disposal of any contaminated soil is the responsibility <br /> of the property owner. s <br /> 3. Laboratory analyses are conducted on a )normal ( 10 day) <br /> turnaround schedule. <br /> 4. Water and electric power are available 'on site during the <br /> drilling. 1 <br /> P <br /> 5 . The county and/or other regulatory agencies do not request <br /> 3 <br /> i � I <br />