Laserfiche WebLink
28 March 2005 <br /> AGE-NC Project No 99-0637 <br />' Page 4 of 4 <br />' Continuation ofthe quarterly groundwater monitoring program The first quarter monitoring <br /> event was performed on 18 February 2005 Reducing the existing sampling schedule by <br /> removing TPH-g, TPH-d and BTEX from the current analysis <br />' Continuation of the 24-week ozone infection pilot test Ozone infection began on 31 August <br /> 2004 AGE estimates that approximately 4 weeks of the 24-week pilot test was lost due to <br /> equipment malfunction and site power outages AGE recommends extending the 24-week <br />' ozone infection pilot test until 31 March 2005 <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation of the hydrogeologlc conditions <br />' at the site for the purpose of this Investigation was made from a limited number of available data <br /> points(Ie ground water samples)and subsurface conditions may vary away from these data points <br /> No other warranty,expressed or implied,Is made as to the professional Interpretations,opinions and <br /> recommendations contained In this report <br /> I <br /> • <br /> Advanced GeoEnnronmental,Inc <br /> I <br />