Laserfiche WebLink
t <br /> Mr. Carl Knowles <br /> Mr. Harold Knowles -2- <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to <br /> remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. <br /> • It is my opinion that it is unnecessary to obtain three bids for this scope of work;the Fund's three <br /> bid requirement is waived for this scope of work. <br /> • If a different scope of work becomes necessary,then you must request pre-approval of costs for the <br /> new scope of work. <br /> • Although I have referred to the Del Tech Environmental proposal in my pre-approval above,please <br /> be aware that you will be entering into a private contract:the State of California cannot compel <br /> you to sign any specific contract. This letter pre-approves the costs as presented in the proposal <br /> dated July 27, 1997 by Del Tech Environmental for conducting the work approved by the County <br /> for implementing the Del Tech Environmental workplan. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, or a <br /> bid waiver from Fund staff,from qualified firms for all necessary corrective action work. The <br /> legislation governing the Fund requires that the Fund assist you in procuring contractor and consultant <br /> services for corrective action. If you need assistance in contracting for corrective action services, don't <br /> hesitate to call me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in the <br /> Reimbursement Request Instructions to confirm that the costs are consistent with this pre-approval <br /> before you will be reimbursed. To make this easier, insure that your consultant prepares his <br /> invoices to match the format of the original estimate, and provides reasonable explanations for any <br /> changes made in the scope of work or increases in the costs. When the invoices are submitted you <br /> must include copies of all: <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the County. <br /> Please call if you have any questions;I can be reached at(916)2274374. <br /> Sincerely, <br /> ORIGINAL SIGNIET) By <br /> Martin Clark,Water Resources Control Engineer <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> Enclosure <br /> Our mission is to preserve and enhance the quality of California's water resources,and <br /> Recycled Paper ensure their proper allocation and efficient use for the benefit ofpresent and future generations. <br />