Laserfiche WebLink
GROUND ZERO ANALYSIS, INC. 9$401?ys. �1�4l- <br /> 3422 W. Hammer Lane, Suite C-294 30 <br /> Stockton, California 95219 <br /> Telephone: (209) 952-3481 <br /> Facsimile: (209) 952-9891 <br /> April 3, 1995 <br /> Ms. Linda Turkatte <br /> San Joaquin County Public Health Services, <br /> Environmental Health Division <br /> P.O. Box 388 <br /> Stockton, CA 95201-0388 <br /> Subject: Response to letter dated March 9, 1995 and Workplan Addendum for Knowles Property, <br /> 102 S. Wilson Way, Stockton, CA (site code 9031) <br /> Dear Ms. Turkatte: <br /> In response to your letter dated March 9, I am writing to provide you with a brief workplan to install <br /> an additional monitoring well adjacent to the subject site. <br /> One groundwater monitoring well will be installed within the warehouse located at 1538 E. Market <br /> Street, adjacent to the subject site. The attached sketch depicts the proposed location of the well. The <br /> well will be constructed of 2" diameter PVC casing and will be screened from approximately 53 to 73 <br /> feet below grade. Soil samples will be collected at five foot intervals during drilling for logging <br /> purposes. One soil sample from the capillary fringe will be submitted for analysis of total petroleum <br /> hydrocarbons as gasoline (TPHG) and benzene, toluene, ethylbenzene and xylenes (BTEX) by EPA <br /> methods 8015/8020. Following development, groundwater samples will be collected from the well and <br /> analyzed for TPHG and BTEX. <br /> All field activities will be conducted in accordance with the Site Safety Plan and our Quality <br /> Assurance/Quality Control Plan. Analyses will be conducted by a State Certified laboratory. <br /> It is my understanding the drilling contractor, Spectrum Exploration, is permitting this well with the <br /> county as well as obtaining the necessary encroachment permits. <br /> We are submitting a copy of this Workplan Addendum to Mr. George Lockwood of the SWRCB UST <br /> Cleanup Fund for pre-approval in order to expedite reimbursement. Once this approval has been <br /> obtained the work will be scheduled. <br />