Laserfiche WebLink
GROUND ZERO ANALYSIS, INC. <br /> 1714 Main Street <br /> Escalon, California 95320 - <br /> Telephone: (209)838-9888 <br /> Facsimile: (209)838-9883 <br /> October 31, 2001 , <br /> Ms. Margaret Lagorio <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> 304 E. Weber Ave., 3rd Fl. <br /> Stockton, CA 95202 <br /> Subject: Workplan for Additional Site Activities <br /> 102 South Wilson Way, Stockton, California <br /> Dear Ms. Lagorio: <br /> Ground Zero Analysis, Inc. (Ground Zero) has prepared this Workplan on behalf of the Knowles <br /> Family 1993 Revocable Trust in response to your directive letter dated July 20, 2001. This <br /> Workplan describes the proposed methodology for the destruction of existing monitoring well <br /> MW13, proposes the installation of additional monitoring wells and discusses remedial <br /> alternatives. This letter also addresses issues raised by PHS/EHD in the July 20 correspondence. <br /> The location of the site is shown on Figure 1. <br /> WORKPLAN <br /> Destruction of Monitoring Well MW13 <br /> San Joaquin County Public Health Services, Environmental Health Division (PHS/EHD) and the <br /> CA Regional Water Quality Control Board (RWQCB) have expressed concern that monitoring <br /> well MW13 may act as a conduit for contamination migration and have ordered that the well be <br /> destroyed. While we disagree with this assessment, the well will be destroyed. The location of <br /> well MW 13 is shown on Figure 2. <br /> A C-57 licensed drilling contractor will destroy the well by pressure grouting with neat cement. <br /> Prior to destruction, total depth of the well will be measured to ensure no obstructions are <br /> present. Neat cement grout will be pumped through tremie equipment in one continuous <br /> operation until the well is completely full. Additional cement will then be added under pressure in <br /> order to force the grout through the well screen and into the filterpack, ensuring an adequate seal. <br /> Pressure will be applied for a minimum of 15 minutes after completely filling the well with cement <br /> grout. <br /> I <br /> roek\c1osure\workp1m\respome.doc <br />