Laserfiche WebLink
ZERO ANALYSIS, INC. <br /> GROUND <br /> Purge Log Forn <br /> Proje;:c Number <br /> Sr 1 71 Site Location <br /> Project Name <br /> ll Na <br /> Dale Og I�� t Field Tc-.h /4 <br /> Total Depth � Depth to water' <br /> �/D.°}� Water Column Le 3s. <br /> ' Casing Diame e: <br /> �- Casing Factor^ Volume Calculation - <br /> Total Purge Volume_ Casing volumes Produced y U Pump Type "r <br /> FH Meter <br /> �I.�- Calibrated©or N Cond_Meter Calibrated�'or N <br /> Temp Meter'A ``— Turbiaity Meter <br /> Caliorated Y or N <br /> [Cas.ng Factor 2"= 17 3"=3S 4"=66 5"=1 02 6"=1 5 8"=2 6 (In Gallons pe'lancer foot)) <br /> ' ,die �"rallans(total D7W 1 pit ( - =4"nu 1 rl Turbidity ( Comments <br /> Tante P-od.P to - NA <br /> -33 I -D-3 <br /> 0 6�s <br /> 0 6H`� I I 11 � I `1► su I a 6 I ls`i� I �� o f I �-�r>> <br /> I I I Ii I I I <br /> I I I I I I I <br /> I I I I I I I I <br /> I I I I I I I I <br /> 15taratre or Disposal Method <br /> sr Total Drx-.s OnsItc S T <br /> '0,,-ent Recnarge Prior to Sampling <br /> Sarr,.pie Collection Meahod <br /> Sample Labeled 1�n '4'U"-9 Sample Time,DSS Laboratory <br /> ' Analysts <br /> lJ'�-2�lT �(, No of Containers 3 <br /> T4 <br /> Duphcate Trip Blank ltansate Blank <br /> i <br /> Comments <br /> t <br />