Laserfiche WebLink
Ms Margaret Lagono <br /> Page 3 of 4 <br /> 1 Table 2 Oxygenates and additive concentrations are summarized in Table 3 Attachment B contains <br /> laboratory reports and chain of custody documentation <br /> ' Groundwater Sampling Summary and Discussion <br /> ' • Water levels rose this quarter Well screens in monitoring wells MW 1 through MW 12 and vapor wells <br /> VW I,VW3 and VW4 remain submerged <br /> ' • TPHg was not detected in wells MW6, MW7,MW9 and MW 11 and benzene was not detected in wells <br /> MW9 and MW 1 I <br /> • Despite increases in some wells this quarter, overall petroleum hydrocarbon concentrations in the <br /> monitoring and vapor extraction wells appear to be generally stable to decreasing <br /> ' • High levels of MTBE persist in the wells located on the southern portion of the property New well <br /> MW 14 was reported to contain a concentration of 24,000 ppb, the highest level ever detected in any <br /> well on the site MTBE is not present in wells located within the area affected by the onsite gasoline <br /> 1 release <br /> • EDB and 1,2-DCA appears to be associated with the onsite release <br /> VAPOR EXTRACTION SYSTEM ACTIVITIES <br /> ' VES Operation <br /> The soil vapor extraction system was not operated during the first quarter of 2001 pending the results of <br /> ' confirmation borings and direction from PHS/EHD regarding further operation of the system <br /> Confirmation borings sampled during the first quarter indicate that no significant vadose soil contamination <br /> remains These results will be presented in a separate report currently in preparation <br /> 1 <br /> RECOMMENDATIONS <br /> VES Operation <br /> Based on the analytical results of the confirmation soil borings we recommend removal of the thermox <br /> system, and destruction of selected vapor extraction wells Specific recommendations will be presented in <br /> the pending report <br /> ' Quarterly Groundwater Monitoring and Sampling <br /> We will perform groundwater monitoring and sampling for the first quarter in May 2001 PHS/EHD will <br /> be notified 48 hours prior to conducting the quarterly fieldwork <br /> mek+wnA1Q1N2001 <br />