My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012183
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
102
>
3500 - Local Oversight Program
>
PR0545890
>
ARCHIVED REPORTS_XR0012183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 12:17:40 PM
Creation date
7/22/2020 11:26:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012183
RECORD_ID
PR0545890
PE
3526
FACILITY_ID
FA0025958
FACILITY_NAME
ROEK BROTHERS CONSTRUCTION
STREET_NUMBER
102
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15502065
CURRENT_STATUS
02
SITE_LOCATION
102 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BALBI & CHANG <br /> �_ _ssocILAT-Es - <br /> Geotechnical Consultants a Materials Testing 151 Link Road Suite A Cordelia CA 94585 (707) 864-2020 <br /> May 11 , 1987 <br /> File No. 1525-10 <br /> Mr. Thomas A. Barghausen, P.E. <br /> Barghausen Consulting Engineers , Inc . <br /> 6625 South 190th, #102 <br /> Rent, Washington 98032 <br /> Subject: Hydrocarbon Evaluation Study for <br /> ARCO AM/PM Facility <br /> Wilson Way and Washington Street <br /> Stockton, California <br /> Dear Mr. Barghausen: <br /> The following report summarizes razes a hydrocarbon evaluation study <br /> performed by Balbi & Chang Associates for the proposed ARCO AM/PM <br /> Facility to be located northeast of the intersection of Milson <br /> 'Kay and Washington Street in Stockton, California. This study is <br /> performed in accordance with guidelines outlined in ARCO <br /> Petroleum Products Company' s site acquisitions standards titled: <br /> "Standard Procedures for Hydrocarbon Evaluations for <br /> The Arco Petroleum Products Company on New "AM/PM" <br /> Site Acquisitions" <br /> SITE DESCRIPTION <br /> The project site is located northeast of the intersection of <br /> Wilson Way and Washington Street in Stockton, California as shown <br /> on the Vicinity Map, plate 1. The entire site had been paved and <br /> utilized as an automobile auction yard. The ground surface is <br /> relatively level with m slight drainage down gradient toward the <br /> northwest. At the time of our investigation, the site was vacant <br /> with chain-link fence surrounding the perimeter. <br />� i <br />
The URL can be used to link to this page
Your browser does not support the video tag.