Laserfiche WebLink
TABLE OF CONTENTS <br /> continued <br /> I ' I <br /> 40 PROPOSED ALTERNATIVE FOR REMEDIATION 19 <br /> i 4 I Soil Vapor Extraction 19 <br /> 42 Groundwater Cleanup Goals 20 <br /> 5 0 PROPOSED SCOPE OF WORK 21 <br /> 5 1 System Design Y g 21 <br /> 5 2 Vapor Extraction System Permitting 21 <br /> ' 5 3 Vapor Extraction System Installation 21 <br /> 5 4 System Startup and Source Testing 21 <br /> ' 5 5 System Operations, Maintenance and Compliance Monitoring and <br /> Reporting 22 <br /> 5 b Confirmation Soil Borings 22 <br /> ' 5 7 Fate and Transport Model 22 <br /> F <br /> 60 SCHEDULE 23 <br /> 70 REFERENCES 24 <br /> I <br /> k <br /> gruundzc'rmklcap it <br /> h <br /> 1 <br />