Laserfiche WebLink
collecting soil samples from the borings, developing and sampling the newly installed wells, <br /> analyzing soil and groundwater samples for TPHg and BTEX using EPA Methods <br /> ' 801518020, and preparing a status report A copy of the Status Report is included in <br /> Appendix 3 <br /> ' During the investigation Ground Zero observed the drilling of seven onsite soil borings (SB- <br /> 24 through SB-27, SB-29, SB-32, and SB-37) and four offsite soil borings (SB-33 through <br /> SB-36) Proposed soil borings SB-28, SB-30, and SB-31 (intended as confirmation borings) <br /> ' were not drilled in the area of the former USTs as originally proposed due to the detection of <br /> gasoline hydrocarbons beneath the former USTs during drilling of boring SB-27 Soil <br /> borings SB-25 and SB-26 were drilled to depths of approximately 40 feet bgs Soil borings <br /> ' SB-24, SB-29, SB-32, and SB-37 were drilled to depths of approximately 55 feet bgs Angle <br /> boring SB-27 was drilled to a vertical depth of approximately 15 feet below the UST <br /> excavation Soil borings SB-33 through SB-36 were drilled to depths of approximately 75-78 <br /> feet bgs Boring logs are included in Appendix 4 <br /> Soil borings SB-24 through SB-26, SB-29, and SB-37 were temporarily plugged at a depth of <br /> approximately 5 feet bgs because subjective analysis of drill cuttings and logged sediments <br /> indicated borings SB-24 through SB-26 and SB-29 would be effective vapor test well <br /> ' locations, and boring SB-37 would be an effective monitoring/ambient air well location <br /> Borings SB-27 and SB-32 were grouted to the surface using neat cement <br /> I ' <br /> Groundwater was observed at depths ranging from approximately 57 to 59 feet during <br /> drilling of borings SB-33 through SB-36 Ground Zero observed Spectrum Exploration <br /> construct 2-inch diameter monitoring wells MW-9 through MW-12 in borings SB-33 through <br /> SB-36, respectively The monitoring wells were screened from approximately 55 to 75 feet <br /> bgs Construction details for these wells and previously existing monitoring wells are <br /> summarized in Table 1 and are graphically presented in the Boring Logs included in <br /> Appendix 4 <br /> Gasoline hydrocarbons were detected in soil samples collected from borings SB-24 through <br /> SB-27, and SB-29 Gasoline hydrocarbons were not detected in soil samples collected from <br /> offsite borings SB-33 through SB-36, and onsite borings SB-32 and SB-37 Analytical results <br /> for soil are summarized in Table 2 Laboratory analytical results and chain-of custody <br /> ' reports are included as Appendix 5 <br /> Groundwater was not present in wells MW-1 through MW-3 Groundwater elevation data <br /> measured during this investigation are summarized in Table 3 Gasoline hydrocarbons were <br /> detected in groundwater samples collected from onsite wells MW-4 through MW-6, and <br /> offsite wells MW-8 through MW-10 Gasoline hydrocarbons were not detected in <br /> groundwater samples collected from onsite monitoring well MW-7, or offsite wells MW-11 <br /> f and MW-12 Groundwater analytical results for samples collected during this investigation <br /> are summarized in Table 4 Laboratory analytical reports and chain-of-custody records are <br /> included as Appendix 5 <br /> grouvd7c%roeklcap 4 <br /> r <br />