My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012193
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
102
>
3500 - Local Oversight Program
>
PR0545890
>
ARCHIVED REPORTS_XR0012193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 12:09:52 PM
Creation date
7/22/2020 11:32:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012193
RECORD_ID
PR0545890
PE
3526
FACILITY_ID
FA0025958
FACILITY_NAME
ROEK BROTHERS CONSTRUCTION
STREET_NUMBER
102
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15502065
CURRENT_STATUS
02
SITE_LOCATION
102 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quality Assurance/Quality Control Plan Page 8 <br /> I <br /> V(XUW Of Op'ON WRE144LE AND ANNULAR SPACE BETWEEN CASING AND HOLE <br /> Male Diameter Volumeltinear ft. of hole Nominal Casing Volumeliinear ft of* <br /> Diameter Annular Space <br />� I <br /> (inches) Gal. Cu.ft. (inches) Gal Cain ft, <br /> 725 214 029 2 1 91 026 <br /> 825 278 037 2 255 034 <br /> 1025 429 057 2 406 054 <br /> 1025 429 057 4 346 046 <br /> 1225 613 082 4 530 071 <br /> "Note Annular volumes will be multiplied by 30%to account for porosity of filter pack <br /> I <br /> If the aquifer is slow to recharge, development will continue until recharge is too slow to <br /> practically continue The volume of water produced versus time will be recorded <br /> All withdrawn groundwater will be stored on-site in 55 gallon waste drums unless permission <br /> is granted by the appropriate regulatory agency to discharge the water to the ground surface or <br /> sanitary sewer Drummed water will be labeled with the source of the water to help ensure <br /> appropriate disposal based on contamination levels. <br /> 11.0 SOEL SAMPLING PROTOCOL <br /> 11.1 SAMPLE COLLECTION DURING DRILLING ACTIVITIES <br /> A proposal will be submitted to the lead Regulatory Authority with proposed bonng/sampling <br /> I <br /> locations The exact location and number of borings at each site will be determined in the field <br /> by the Project Geologist/Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.