My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012198
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
102
>
3500 - Local Oversight Program
>
PR0545890
>
ARCHIVED REPORTS_XR0012198
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 12:16:51 PM
Creation date
7/22/2020 11:33:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012198
RECORD_ID
PR0545890
PE
3526
FACILITY_ID
FA0025958
FACILITY_NAME
ROEK BROTHERS CONSTRUCTION
STREET_NUMBER
102
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15502065
CURRENT_STATUS
02
SITE_LOCATION
102 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Ms Margaret Lagono <br /> Page 5 of 6 <br /> ' VAPOR EXTRACTION SYSTEM ACTIVITIES <br /> ' VES Operation <br /> The soil vapor extraction system was shut down intentionally during the first quarter of 2000 <br /> ' pending the results of confirmation borings and direction from PHS/EHD regarding further <br /> operation of the system <br /> ' Vapor Sample Analytical Results <br /> No vapor samples were collected during the fourth quarter of 2000 <br /> RECOMMENDATIONS <br /> ' Evaluate Current Conditions <br /> ' As proposed in our Workplan (09117/99) and the addenda thereto (6127100, 9111100) we <br /> recommend drilling soil borings to evaluate the effect vapor extraction has had on residual soil <br /> . contamination, and to further define the vertical limits of contamination The amended workplan <br /> ' was approved by PHS/EHD on October 31, 2000 Drilling is scheduled to occur within the next <br /> month Pending completion of this work, we recommend the following <br /> tVES Operation <br /> ' System operation was suspended on January 3, 2000 We recommend leaving the thermox <br /> system on standby until the results of the confirmation soil borings have been evaluated <br /> ' Quarterly Groundwater Monitoring and Sampling <br /> We will perform groundwater monitoring and sampling for the first quarter in February 2001 <br /> 1 Prior to conducting the fieldwork and based upon the results of the confirmation borings we may <br /> recommend a reduction in the sampling frequency and/or analytical suite for some wells <br /> i <br /> i <br /> ' roek4nr4QM2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.