My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012221
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
102
>
3500 - Local Oversight Program
>
PR0545890
>
ARCHIVED REPORTS_XR0012221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 12:12:06 PM
Creation date
7/22/2020 11:44:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012221
RECORD_ID
PR0545890
PE
3526
FACILITY_ID
FA0025958
FACILITY_NAME
ROEK BROTHERS CONSTRUCTION
STREET_NUMBER
102
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15502065
CURRENT_STATUS
02
SITE_LOCATION
102 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
View images
View plain text
Mr. Nuel Henderson <br /> Page 4 of 4 <br /> groundwater sampling schedule described in Table 4 pending the possible transfer of sampling <br /> responsibility for several of the wells. <br /> Vapor Extraction System Operation <br /> The analytical data collected during the previous quarter indicate a fairly substantial rebound <br /> since the system was idled in 2002. An initial hydrocarbon extraction rate of at least 20 <br /> pounds per day could be anticipated if the system were in operation. By focusing on wells <br /> VW2, VW5 and VW6, this rate could quite likely be increased. Only by placing the system <br /> back in operation can it be determined how quickly vapor concentrations will decrease. We <br /> recommend placing the system back in operation as soon as repairs can be made. <br /> Work Proposed for First Quarter 2006 <br /> The next quarterly groundwater sampling event is scheduled for March 2006. We propose to <br /> conduct this concurrently with sampling at the Top Filling Station site (101 S. Wilson Way) <br /> and the ARCO site (130 S. Wilson Way). A Site Conceptual Model incorporating data from <br /> each of the three sites is in preparation and will be submitted to your office. Repairs to the <br /> thermal oxidizer will be made. Installation of proposed deep monitoring well MW17C is <br /> scheduled for the first quarter. <br /> If you have any questions or comments regarding this report, please contact us at your earliest <br /> convenience. <br /> Respectfully, <br /> Ground Zero Analysis, Inc. <br /> J, uooc, <br /> Joseph L. Vasquez, <br /> Staff Geologist cMP <br /> Jsrmt <br /> WSW �r <br /> Gregory P. Stahl, PG 5023 <br /> CA Certified Hydrogeologist No. 264 Of CA <br /> Attachments <br /> cc: Mr. Carl Knowles <br /> Mr. Pat Riddle, Esq., Law Offices of Patrick D. Riddle <br /> Mr. James L.L.Barton, RWQCB Sacramento <br /> Mr. Mohammed Asghar <br /> Mr. Jay Johnson, Stratus Environmental <br /> Mr. Tim Cuellar, Advanced GeoEnvironmental <br /> G:IG RO[JNDJEIROEKIQMR12005%q m2005.d oc <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).