Laserfiche WebLink
' Purge Loa Form <br /> Project Name: YvvAA- ( <br /> Projcvt Number:_ ��'_ 6,__ <br /> - Site Lavation; J'A3�6&1 <br /> oil No: _ Date: d O4 FieId Teeh:A- <br /> f <br /> Total Depth. Depth—to <br /> Rater: y`1.-7 S Water Column Length: <br /> b 3/..i-o <br /> ' Casing Diameter: Z Casing Factor:, R Volume Calculation- S j? <br /> Total Purge Volume: �I-�- Casing volumes Produced: 3-6 <br /> ----�_. pump Type: <br /> PH Meter (' 44-v Calibrated.0or N Cond.Meter: �—_ <br /> . k"sem, Calibrated:Cbr N <br /> Temp Meter., Turbidity Meter._ & Calibrated:Y or N <br /> ' (Caning Factor: 2"=.17 3"=.38 4"=.66 5"=1.02 6"=1.5 8"=2.6 Gallons r ' <br /> (in per linear font)) <br /> _Time = —- ----- - ------ ------ - - - -- - _ <br /> Prod=Rate=Cralloti(total)=DTW=ph=—Ee=--=TemA(°C3=`Tuzi3iiiitir -_ - - -_—- <br /> Comments�--- _ <br /> • mow-. <br /> IVA- <br /> o S3sr 01 <br /> r <br /> Storage or Disposal Method: S+S Total Drums Onsite: <br /> tcrccnt Recharge Prior to Sampling- p J� <br /> Sample Collection Method: 0(45 o5 -s,b <br /> sample Labeled: <br /> Sample Time: U C] Laboratory: <br /> Analysis: ,(,fc1, T I1G 1 ) 2- MA s Cn3 <br /> No. of Containers: <br /> tuplicate: Trip Blank: Rinsate Blank: <br /> �orrrments: <br />