Laserfiche WebLink
Work Plan for Additional Site Assessment <br /> and Interim Remediation/Feasibility Testing <br /> ARCO Facility No.5469 <br /> Stockton,California <br /> Page 12 <br /> If you have any questions or comments concerning thiswork plan, please contact Jay <br /> Johnson at(530) 676-•6000. <br /> Sincerely, <br /> DELTA ENVIRONMENTAL CONSULTANTS,INC. <br /> 4ject <br /> wnowtha J 0ana "er' <br /> Engineer roj <br /> Attachments: Figure 1 Site location Map <br /> Figure 2 Groundwater Elevation.Contours (4"`Quarter 2001) <br /> Figure 3 Proposed Well Location Map <br /> Figure 4 C-Sparge &Trench Location Map <br /> Appendix•A Historical-Elevation-and Analytical Data <br /> Appendix B Manufacturer'.s Literature <br /> cc: Mr.Paul Supple, Atlantic Richfield Company <br /> Mr.Marty Hartzell, California Regional Water Quality Control Board <br /> I <br /> F <br /> I <br /> PAARC01546%Work Plan\5469 wrkpin 03-2002.doc <br />